My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - WARNER BIKEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
25B - AGMT - WARNER BIKEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:41:22 PM
Creation date
11/12/2019 2:48:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
11/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION <br />PROJECT PROGRAMMING REQUEST <br />DTP-0001 (Revised July 2017) <br />General Instructions <br />Amendment (Existing Project) No I Date: 10/7/19 <br />District <br />EA <br />Project ID <br />PPNO <br />MPO ID Alt Proj. ID <br />12 <br />County <br />Route/Corridor <br />PM Bk <br />PM Ahd <br />Project Sponsor/Lead Agency <br />ORA <br />Warner <br />N/A <br />N/A <br />City of Santa Ana <br />MPO Element <br />SCAG Local Assistance <br />Project Manager/Contact <br />Phone <br />E-mail Address <br />Cory Wilkerson <br />714 647-5643 <br />cwilkerson santa-ana.or <br />Project Title <br />Warner Avenue Class II <br />Location (Project Limits), Description ( Scope of Work) <br />This project will construct an approximately 0.65 mile long Class II Bikeway along Warner Avenue, from Wright Street, <br />over State Route 55 (SR-55), to Red Hill Avenue. The Warner Avenue project will bridge a gap between funded future <br />bikeways west of Wright Street in the City of Santa Ana, and existing facilities east of Red Hill Avenue in the City of Tustin. <br />Component <br />PA&ED <br />Implementing Agency <br />City of Santa Ana <br />PS&E <br />City of Santa Ana <br />Right of Way <br />N/A <br />Construction <br />City of Santa Ana <br />Legislative Districts <br />Assembly: 1 69 Isenate7 1 34 ICongressional7 1 46 <br />Project Benefits <br />The project will close a gap in bikeways since the City of Santa Ana has a funded project to provide Class II bike lanes <br />between Main Street and Wright Street. The proposed project will extend Class II bike lanes easterly from Wright Street, <br />over SR-55 and to Red Hill Avenue where on -street bike lanes exist on Warner Avenue. Additionally, funding for on -street <br />bike lanes are proposed for Red Hill Avenue so this project component will link to existing bike lanes on either side of SR- <br />55 and to the parallel roadway (Red Hill Avenue). The new crossing of SR-55 is needed in this area to better serve <br />access to City of Tustin jobs at Tustin Legacy and City of Santa Ana residential uses west of SR-55. <br />Purpose and Need _ <br />Orange County has one of the highest rates of bicycle and pedestrian injuries in the State of California. OCTA is currently <br />completing the OC Active, a countywide active transportation plan. The preliminary results show high concentrations of <br />bicycle and pedestrian needs in and around the Central County Corridor. <br />Category <br />Outputs/Outcomes <br />Unit <br />Total <br />Local Streets and Roads <br />Bicycle lane/ sidewalk miles <br />Miles <br />0.65 <br />ADA Improvements No <br />Bike/Ped Improvements Yes Reversible <br />Lane analysis No <br />Includes Sustainable Communities Strategy Goals Yes Reduces Greenhouse Gas Emissions Yes <br />Project Milestone <br />Existing <br />Proposed <br />Project Study Report Approved <br />N/A <br />Begin Environmental (PA&ED) Phase <br />N/A <br />Circulate Draft Environmental Document IlDocument Type ICE <br />N/A <br />Draft Project Report <br />N/A <br />End Environmental Phase (PA&ED Milestone) <br />N/A <br />Begin Design (PS&E) Phase <br />7/1/2020 <br />End Design Phase (Ready to List for Advertisement Milestone) <br />6/30/2021 <br />Begin Right of Way Phase <br />N/A <br />End Right of Way Phase (Right of Way Certification Milestone) <br />N/A <br />Begin Construction Phase (Contract Award Milestone) <br />12/31/2021 <br />End onstructPhase (Construction Contract Acceptance Milestone) <br />CCloseouiont <br />12/30/2023 <br />Begin Phase <br />12/30/2023 <br />End Closeout Phase (Closeout Report) <br />6/30/2024 <br />ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or <br />write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814. <br />
The URL can be used to link to this page
Your browser does not support the video tag.