Laserfiche WebLink
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, AA No. 2018-10 <br />2525 North Main Street <br />November 19, 2019 <br />Page 3 <br />The North Santa Ana Preservation Alliance continued to voice opposition to the project and stated <br />that they would support three development options: rehabilitation and reuse of the existing office <br />building, redevelopment of the site with a new office building built in compliance with the <br />Professional zoning standards, or a residential project at a maximum density of 15 dwelling units <br />per acre (89 dwelling units). The first two options would be feasible under the existing zoning and <br />general plan. The third option would require a zone change to Two -Family Residential (R2) and a <br />general plan amendment to Medium Density Residential (MR-15) General Plan land use <br />designation. The applicant has indicated that the three development options proposed would make <br />the residential development project infeasible. <br />At its regular meeting on August 12, 2019, and after receiving public testimony on the item, the <br />Planning Commission vote resulted in an impasse on the proposed 347-unit residential <br />development. The project was scheduled for a City Council public hearing; however, in September <br />the applicant advised staff that they would be making further modifications to the project to address <br />the comments received at the August 12th Planning Commission meeting. The modifications to the <br />project were substantially different than the project reviewed by the Planning Commission on <br />August 12, 2019, and therefore, must be reviewed by the Planning Commission for a <br />recommendation prior to returning to the City Council. <br />Modified Project <br />On September 5, 2019, a meeting between the applicant and neighborhood was held to discuss <br />another series of modifications to the project that could include a reduction the number of units, <br />reduction in project density and intensity, an increase in the parking ratio, and an additional <br />increase in the building setbacks. The applicant expressed that their goals in making these <br />modifications were to address community input and concerns, create an opportunity for additional <br />parking for the Discovery Cube and the proposed development, to maintain as much of the existing <br />development pattern and existing parking lot as feasible, and to minimize changes to the <br />neighborhood at the project's edge. The modifications to the project to date represent a significant <br />reduction from previous submissions. However, the modified project remains inconsistent with the <br />development options that the North Santa Ana Preservation Alliance expressed they would <br />support. <br />In early October, the applicant formally submitted a modified project that consists of the following <br />elements: <br />• A reduction in the number of units to 256 units (formerly 347 units) <br />• A reduction in the project density to 58 dwelling units per acre (formerly 59 du/ac) <br />• An increase in the building setback on the east to 90 feet (formerly 66 feet) <br />• An increase in the building setback on the south to 134 feet (formerly 15 feet) <br />• The addition of residential surface level parking (104 spaces) along the east property line <br />• The addition of a surface level parking lot with shared parking with the Discover Cube along <br />the south property line (180 spaces) <br />• An increase in parking to 2.0 parking spaces per unit and 2.7 spaces per unit when utilizing <br />the shared parking lot (formerly 1.85 parking spaces per unit with 2.0 valet) <br />