Laserfiche WebLink
parking structure would provide direct access to the leasing office and walkways to residential units, a <br />bicycle parking/sharing station, and 904 parking spaces, which is an average of 1.8 spaces per residential <br />unit. The parking spaces would include 122 tandem spaces, 25 electric vehicle charging stations, and 21 <br />spaces compliant with the Americans with Disabilities Act (ADA). The parking structure would also <br />provide direct access to the fitness center, club room, and amenity deck located on top of the western <br />portion of the structure. <br />As originally proposed and as described and analyzed in the EIR, the Project would provide open space <br />and recreation facilities that includes approximately 34,300 square feet of exterior open space and <br />recreation facilities and 6,960 square feet of indoor recreation facilities that would contain: 5 recreational <br />courtyard areas, a rooftop amenity deck and fitness center on the roof of the parking structure, community <br />room, and a wellness center. hi addition, each residential unit includes a private patio or balcony area. The <br />open space, recreation areas, and other amenities are listed in Table 2. <br />Table 2: Summary of Project Open Space / Recreation Amenities (Originally Proposed Project) <br />Open Space <br />Approximate <br />Square Footage <br />Open Space Recreational Courtyards 1-5 <br />22,900 <br />Wellness Center <br />1,600 <br />Community Room <br />4,700 <br />Resident Services Business Center <br />3,900 <br />Bic cle Repair Room <br />280 <br />Dog Wash Room <br />40 <br />Fitness Center <br />5,400 <br />Amenity Deck not including Fitness Center <br />11,400 <br />As originally proposed and as described and analyzed in the EIR, the Project would provide vehicular <br />access via a driveway on N. Main Street that would guide vehicles to the parking structure that provides <br />direct access to the residential units, guest parking, and the leasing office. The Project was also originally <br />proposed to implement a secondary access from either Santiago Park (Option B) or Edgewood Road <br />(Option C). Additionally, separate emergency access would be provided from Edgewood Road by <br />knoxbox-gated entrances and onsite emergency lanes that meet the City's Fire Code requirements. <br />As originally proposed and as described and analyzed in the EIR, the Project would connect to the existing <br />water, sewer, and drainage infrastructure in the N. Main Street and Edgewood Road right-of-ways. <br />• Water Infrastructure: The Project would install new water infrastructure on the Project site that <br />would connect to the existing 16-inch water pipelines in N. Main Street and Edgewood Road. The <br />new onsite water system would be compliant with the CalGreen Plumbing Code (Title 24) for <br />efficient use of water. <br />Wastewater Infrastructure: Wastewater from the Project site currently discharges into existing <br />City -owned 6- and 12-inch sewer lines within Edgewood Road. The Project would install a new <br />onsite sewer system that connects to the existing sewer lines in Edgewood Road. <br />Drainage Infrastructure: Surface runoff from the site is conveyed within onsite curb and gutters <br />to an existing catch basin in N. Main Street and sheet flows to an existing drain inlet at the south- <br />west corner of the parking lot. In addition, sheet flows on the north side of the building flow to the <br />existing 10-inch storm water drain that conveys unfiltered runoff to Santiago Creek. The Project <br />would cap this existing 10-inch storm water drain. It would remain in place but would no longer <br />Resolution No. Page 5 of 76 <br />Certification of the Magnolia at the Park EIR <br />