My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - 2525 N MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
75D - PH - 2525 N MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:54:38 PM
Creation date
11/14/2019 5:55:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Final FIR for the Project, including the "Clarifications to the Final EIR" <br />1.4 Custodian and Location of Records <br />The documents and other material that constitute the record of proceedings on which these findings are <br />based are located at the City of Santa Ana, Planning Division Counter at 20 Civic Center Plaza, M-20 <br />Santa Ana, California, 92701. The custodian for these documents is the City of Santa Ana. Copies of these <br />documents which constitute the record of proceedings are and at all relevant times have been and will be <br />available upon request at the City of Santa Ana. This information is provided in compliance with Public <br />Resources Code Section 21081.6(a)(2) and CEQA Guidelines Section 15091(e). <br />2.0 PROJECT LOCATION <br />The Project is located at 2525 North (N.) Main Street, in the northern portion of the City of Santa Ana <br />approximately 500 feet east of Interstate (I)-5. The site is located on the northeast corner of N. Main Street <br />and Edgewood Road. Regional access to the Project site is provided by I-5 and the N. Main Street exit; <br />and local access to the Project site is provided by N. Main Street and Edgewood Road. <br />The Project site consists of 6 contiguous parcels that include Assessor Parcel Numbers (APNs): 003-010- <br />028, 003-010-01, 003-010-03, 003-010-025, 003-010-026, 003-010-030 and is located within the U.S. <br />Geologic Survey (USGS) Orange County 7.5 Minute Series Topographic Quadrangle. <br />3.0 <br />3.1 Originally Proposed Project <br />As originally proposed and as described and analyzed in the EIR, the Project would redevelop the 5.9- <br />acre Project site to provide 496 for -rent multi -family residential units. The residences would be provided <br />within approximately 572,075 square feet of residential structures. The development would be 5 stories <br />and be topped with mezzanines reaching approximately 65-feet 8-inches in height. The development <br />would tier down to 2-stories (slightly over 20-feet in height) on the eastern portion of the site. The <br />residential units would be wrapped around a 358,630 square foot central parking/fitness center/club room <br />structure with a roofline of approximately 90 feet from the ground surface, which is the highest point of <br />the Project. The Project would result in approximately 930,705 square feet of development and a density <br />of 84 dwelling units per acre, and would provide a mix of studio, one -bedroom, two -bedroom, and three - <br />bedroom units, as shown in Table 1. <br />Table 1: Residential Unit Summary (Originally Proposed Project) <br />Unit Type <br />Number of Units <br />Square Footage of Units <br />Percentage' <br />Studio <br />73 <br />590 — 740 <br />15% <br />1 Bedroom <br />307 <br />610 — 1,090 <br />62% <br />2 Bedroom <br />88 <br />910 — 1,470 <br />18% <br />3 Bedroom <br />28 <br />1,360 — 1,520 <br />6% <br />Total <br />496 <br />100% <br />'Rounded to the <br />nearest oereentme. <br />As originally proposed and as described and analyzed in the EIR, the residential units would be setback a <br />minimum of 40 feet from the cement block wall that forms the eastern Project site boundary and would <br />be separated by 4 courtyards and landscaped areas. The central parking structure would have 9 levels of <br />parking, one of which would be underground; thus, 8 levels of parking would be above ground. The <br />Resolution No. Page 4 of 76 <br />Certification of the Magnolia at the Park EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.