My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - TPM NO. 18-02
Clerk
>
Agenda Packets / Staff Reports
>
Zoning Administrator (2009-Present)
>
2019
>
07-31-19
>
1 - TPM NO. 18-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 5:16:11 PM
Creation date
11/20/2019 5:15:27 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tentative Parcel Map No. 2018-02 – AMG First Point Subdivision <br />July 31, 2019 <br />Page 2 <br /> <br /> <br />Project Description <br /> <br />The applicant is requesting approval of a parcel map to subdivide an existing site comprised of two <br />lots into a single lot with two condominium units, one per each building that will be developed on the <br />site. No subdivision for each residential or commercial unit is proposed, nor is a fee-simple subdivision <br />proposed to create two fee-simple lots. <br /> <br />Project Background <br /> <br />AMG and Associates submitted plans for a mixed-use, affordable development at the subject site in <br />August 2016. Through the Development Project Review process, the project was refined in scope to <br />include a two-building development consisting of 552 affordable residential units and 10,000 square <br />feet of leasable commercial space, landscaping, a leasing office, parking, and additional onsite <br />amenities. Shortly after the development was approved by the Planning Commission in June 2018, <br />the applicant expressed intent to submit a subdivision to create two parcels on the development site. <br />The subdivision is intended to facilitate the development’s financing, which is split for each building <br />due to the scale of the project and the mixed-use nature of the front building and the entirely- <br />residential nature of the second building. The required Density Bonus Agreement for the project is <br />subject to City Council approval as a separate item and remains pending as of the preparation of this <br />Request for Zoning Administrator Action staff report. <br /> <br />Staff worked with the applicant to ensure the subdivision type proposed would conform to City <br />standards, and the applicant submitted the subject tentative parcel map for two condominium units in <br />August 2018. Proposals to create subdivisions of less than five parcels, such as the current project, <br />require review and approval by the Zoning Administrator. <br /> <br />Project Analysis <br /> <br />Subdivision requests are governed by Chapter 34 and Chapter 41 of the SAMC. Pursuant to Section <br />66473.5 and 66474 of the California Subdivision Map Act, applications for tentative parcel maps are <br />approved when it can be shown that findings can be made in support of the request. Specifically, <br />findings related to the proposal being consistent with the General Plan, the site is in conformance <br />with all applicable City ordinances, the project site is physically suitable for the type and density of <br />the proposed project, the proposed project will not cause substantial environmental damage or <br />substantially and avoidably injure fish and wildlife or their habitat, the proposed project will not cause <br />serious public health problems, or the proposed project will not conflict with easements necessary <br />for public access through or use of the property must be made. Using this information staff has <br />prepared the following analysis, which, in turn forms the basis for the recommendation contained in <br />this report. In analyzing the applicant’s request, staff believes that the following analysis warrants <br />approval of the tentative parcel map. <br /> <br />The applicant is seeking approval of a tentative parcel map to subdivide the subject parcels into a <br />single lot with two condominium units, one per entitled building on the site. In conjunction with the <br />parcel map, the applicant is intending to start construction on the mixed-use development entitled
The URL can be used to link to this page
Your browser does not support the video tag.