Laserfiche WebLink
of Santa Ana <br />4.5.2 System Pressures <br />MainPlace Mall Transformation Project <br />Water Supply Assessment <br />The system supplies potable water to two pressure zones (High Zone and Low Zone) and consists seven <br />booster pump stations, and four pressure reducing valve/pressure sustaining valve (PRV/PSV) stations. In <br />general, the facilities are consolidated into several stations consisting of multiple groundwater wells, a <br />storage reservoir, and a booster pump station. At each station, the wells pump groundwater to the storage <br />reservoir and the booster pump station pumps the water from the storage reservoir to the distribution <br />system. The system also includes several wells that pump directly into the distribution system with no <br />storage reservoir or booster pump station. There are four PRV/PSV stations that allow flows from the High <br />Zone to the Low Zone. <br />4.5.3 Local Project Infrastructure <br />The City owns and maintains street and water infrastructure surrounding and within the MainPlace Mall <br />site. Mainplace Drive surrounds the north, west, and east sides of the mall. In addition to Mainplace Drive, <br />a public street, an on -site main private drive aisle that surrounds the all four sides of the mall is located <br />immediately adjacent to the mall structure. The project site lies at the extreme north end of the City's <br />water system. The City has water mains in the following locations: <br />• A 16-inch asbestos cement pipe (ACP) in Main Street, terminating at the north leg of MainPlace <br />Drive <br />• A 16-inch ACP in the south leg of MainPlace Drive from Main Street to the southwest mall entry <br />drive <br />• A 12-inch ACP in the north leg of MainPlace Drive from Main Street to the north leg of the on -site <br />private ring road. <br />• A 16-inch ductile iron pipe under 1-5, connecting to the MainPlace Drive main at the southwest <br />corner of the project site <br />A 16-inch ACP in southwest private drive entry from MainPlace Drive to the on -site private ring <br />road. This main is located in a public utility easement (PUE). <br />• A 16-inch ACP in south private drive entry (the Broadway extension) from MainPlace Drive to the <br />on -site private ring road. This main is located in a PUE. <br />• A 12-inch ACP in the on -site ring road, looping around the project site. This main is located in a <br />PUE. <br />In addition to the mains, the City also has approximately 15 fire hydrants near the project site and <br />approximately 24 water meters serving the site. <br />The infrastructure adjacent to the project site was installed in the 1990s and is not identified for <br />replacement in the 2017 Water Master Plan. The project site is located in the City's high-pressure zone <br />and hydrant flows are in the highest category listed in the 2017 Water Master Plan. <br />Kimley»)Horn 55 -27 Page 119 <br />