Laserfiche WebLink
City of Santa Ana <br />Table 5 identifies the Project's forecasted water demand. <br />MainPlace Mall Transformation <br />Water Supply Assessment <br />Table 5: MainPlace Specific Plan — Proposed Project Water Demand <br />Use <br />Unit <br />Number <br />Demand Rate <br />(gpd) <br />Demand (gpd) <br />Multi -family Residential <br />Unit <br />1,900 <br />190 <br />361,000 <br />Hotel <br />Room <br />400 <br />180 <br />72,000 <br />Commercial <br />Acres <br />47.6 <br />2,500 <br />119,000 <br />Total <br />552,000 <br />(618 AFY) <br />The Project will be phased overtime. Table 6 identifies the anticipated level of development on the project <br />site between 2020 to 2040. <br />Table 6: MainPlace Phased Development Pattern and Water Demand <br />2020 <br />2025 <br />2030 <br />2035 <br />2040 <br />Incremental Development Percentage <br />10% <br />50% <br />40% <br />0% <br />0% <br />Accumulative Development Percentage <br />10% <br />60% <br />100% <br />100% <br />100% <br />Total Project Demand <br />62 AFY <br />371 AFY <br />618 AFY <br />618 AFY <br />618 AFY <br />These Project demands are compared in Table 7 to the anticipated City demands and demands increases <br />from 2020 to 2045. Other Water Supply Assessments prepared after the most recent UWMP must be <br />included in this analysis, and the City provided Water Supply Assessments for three other Projects: the <br />County of Orange Civic Center Facilities Strategic Plan (OCC), the 2525 N. Main Street Residential <br />Development (AC 2525) project, and the Elks Site Mixed -Use Development at 1660 E. First Street Project <br />(Elan). No other project WSAs outside of the three listed above were identified by the City. The project <br />water demands are included in the table to determine if the combined demands of the OCC project, AC <br />2525 residential project, Elan residential project, and MainPlace Project are within the anticipated overall <br />City demands. <br />Kimley>»Horn 55G-29 Page 121 <br />