My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT TETRA TECH INC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
25K - AGMT TETRA TECH INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:55:12 PM
Creation date
1/16/2020 6:20:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pmposel for <br />Dan Helt, PE, PLS <br />SURVEYING/MAPPING <br />20% <br />Chris Jansen, PE, <br />LEED AP, <br />DRAINAGE/WATER QUALITY/LID <br />75% <br />CITY PROJECT MANAGER <br />Sean Thomas, PE <br />Nate Schreiner, PE,QSD <br />80% <br />Justin Smith, PE <br />80% <br />Summary Qualifications of Key Personnel <br />Mauricio Argente, RLA, <br />QSD/P, ENV SP <br />10% <br />Jason Fussel, PE, PLS, LEED AP, <br />QSD/P, ENV SP <br />20% <br />Tyler Para, PE <br />ROADWAY DESIGN ENGINEER <br />80% <br />Andy Duong, PE <br />ALLIANCE GROUP ENTERPRISE <br />TRAFFIC SIGNALIZATION <br />80% <br />Our proposed team is highly qualified and motivated to undertake this project. Their credentials are <br />summarized below and full resumes are appended to this proposal. <br />Project Manager <br />wa +a Nate Schreiner, PE, QSD <br />Mr. Schreiner manages civil <br />engineering projects, applying his <br />technical experience with roadway, <br />grading, flood protection structures, <br />hydrologic and hydraulic modeling, ADA assessments, <br />and cost estimating, for municipal clients throughout <br />Southern California. He is currently serving as the <br />project manager for the planning, pre -design, and <br />design of complete streets projects for the City of <br />Los Angeles involving pedestrian signals, pedestrian <br />push buttons, cross walks, and road striping. Mr. <br />Schreiner is reviewing the design, managing staff, and <br />managing surveying and underground utility mapping <br />subcontractors. <br />RELEVANT EXPERIENCE: <br />Complete Streets Projects, City of Los Angeles <br />Task Order Manager for On -Call Contracts with Los Angeles County <br />Metropolitan Transportation Authority (Metro), City of Los Angeles, <br />John Wayne Airport, Riverside County Transportation Commission <br />(RCTC), Orange County Public Works (OCPW), and Los Angeles <br />County Department of Public Works <br />Caruthers Park Stormwater and Urban Runoff Capture Project City <br />of Bellflower <br />Los Angeles Unified School District (LAUSD),ADA Barrier Removal <br />Program, LosAngeles County <br />CITY OF SANTA ANA 2 W421 <br />
The URL can be used to link to this page
Your browser does not support the video tag.