My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT TETRA TECH INC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
25K - AGMT TETRA TECH INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:55:12 PM
Creation date
1/16/2020 6:20:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Justin Smith <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO.: 10-110 <br />enhancements, ADA ramps, new and enhanced crosswalks, and safety <br />features that include curb pedestrian signals and new pedestrian lighting <br />along all new/improved walkways. The project will provide nearly4,000 <br />linear feet of new, replaced, and reconstructed sidewalk. The sidewalk <br />improvements will include new and reconstructed ADA ramps and <br />crosswalks, providing connectivity to various key community features and <br />adjacent neighboring locations. Vehicle traffic calming improvements will <br />consist of installing a new traffic signal at the intersection of 4th Street <br />and Clarence Street. <br />DTLA Arts District Pedestrian and Cyclist Safety Active <br />Transportation Project (ATP 3), City of Los Angeles, Bureau of <br />Engineering, Los Angeles, CA. Design Engineer responsible for providing <br />pre -design services and plans, specifications and estimates forth is active <br />transportation project, funded by a Ca [Trans ATP grant. The project <br />improvements will provide pedestrian and cyclist improvements including <br />new cycle tracks, bike lanes, bike routes, new and widened sidewalks with <br />curb extensions, new traffic -controlled intersections, a new shared street <br />connectingto the new Sixth Street Viaduct Arts Plaza, as well as green <br />street elements. The goal of this Caltrans Local Assistance Program funded <br />project is to increase the mobility and safety for non -motorized users to <br />achieve the regional agency's greenhouse gas reduction goals, and aid in <br />the enhancement of the public's health. <br />Soto Street Bridge over Mission Road and Huntington Drive Bridge <br />Removal and Street Improvement Project, City of Los Angeles, <br />Bureau of Engineering, Los Angeles, CA. Design Engineer responsible <br />for providing engineering design support services during construction <br />including existing utility coordination and respondingto requested design <br />changes for the Soto Street Bridge over Mission Road and Huntington <br />Drive Bridge Removal and Street Improvement Project. <br />Los Angeles River Greenway - West Valley, City of Los Angeles, CA. <br />Design Support for the preparation of Plans and construction support for <br />a new bikeway along the Los Angeles River channel from Winnetka Avenue <br />to Mason Avenue. The proposed bikeway is inside the channel, requiring <br />modifications to the channel cross section and retaining wall design. <br />Tetra Tech prepared a 2-D hydraulic model to study the effects the new <br />section will have on waving and ramping patterns, in accordance with the <br />Army Corps of Engineers requirements. The project also includes bikeway <br />plans and profiles, signing and striping, lighting plans, and structural <br />plans for the retaining walls and bikeway. <br />Los Angeles Avenue Raised Median and Landscaping Project, City of <br />Moorpark, Moorpark, CA. Design Engineer responsible for preparing <br />hydrology and hydraulic calculations for modifications and additions <br />to the storm drain system. Tetra Tech prepared the PS&E and the <br />Environmental Document to construct landscaped Raised Median on Los <br />Angeles Avenue (SR-118) within the City of Moorpark. SR-118 from State <br />Route 23 (SR-23) west to Butter Creek Road serves as a major east -west <br />arterial through the City of Moorpark. Average Annual Daily Traffic (AADT) <br />through this section of Los Angeles Avenue varies from 22,000 to 40,000 <br />vehicles per day. <br />EDUCATION <br />BS, Civil Engineering, University of <br />Irvine, 2013 <br />REGISTRATIONS/ <br />CERTIFICATIONS <br />Professional Engineer, California, <br />No. 85736, 2016 <br />RESUMES 25Ke-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.