My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT TETRA TECH INC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
25K - AGMT TETRA TECH INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:55:12 PM
Creation date
1/16/2020 6:20:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tyler Para <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO.: 10-110 <br />Pacoima Wash Mountain Bikeway, Mia Lehrer and Associates for <br />Mountains Recreation & Conservation Authority (MRCA), Los <br />Angeles, CA. Design Engineer responsible for preparing hydrology and <br />hydraulic calculations required for modifications and additions to the <br />storm drain system for the proposed pedestrian bridge over Pacoima <br />Wash. Tetra Tech was contracted by landscape architects Mia Lehrer + <br />Associates (MLA) to prepare the plans, specifications, and estimates for <br />the design and construction of a 3.25-mile Class I Bikeway, including <br />multi -phase planning, design coordination, administrative approval <br />process and preparation of engineering and construction plans. The <br />new bikeway connects densely -populated areas of the San Fernando <br />Valley to each other, to existing future parks and amenities, including <br />the Angeles National Forest. The design of the bike path included <br />protective fencing alongthe wash, signage and striping of existing service <br />roads, approximately 1.5 miles paved areas, striping of street crossings, <br />protected crossing of a rail bridge, inclusion of additional bridge crossings <br />over Pacoima Wash, and native landscape planting and irrigation. The <br />bikeway is planned as multi -use (bicycle, pedestrian and equestrian) and <br />where space allows, a separate and protected path for pedestrians will be <br />incorporated into the design for maximum safety of users. <br />Newhall Ranch Land Development, Mission Village, The Newhall <br />Land and Farming Company, Valencia, CA. Design Engineer responsible <br />for street plans, profile sheet sets, signing and striping in compliance <br />with county codes and regulations. Performed engineering analysis to <br />ensure functionality in the roadway and intersection designs with the <br />safety of road users in mind. The Mission Village project consisted of <br />the development of residences including townhomes, condominiums, <br />apartments and single-family homes to create a new "downtown" urban <br />living environment. <br />La Palma and State College Boulevard Intersection, City of Anaheim, <br />Anaheim, CA. Design Engineer responsible for the development of plan <br />and profile, geometric design, and conceptual striping plans. Tetra Tech <br />is providing topographic surveys, plans and profile design sheets, traffic <br />control sheets, and striping sheets for street widening atthe intersection <br />of East La Palma Avenue and North State College Boulevard. <br />EDUCATION <br />BS, Civil Engineering, California <br />Polytechnic University, <br />San Luis Obispo, 2014 <br />REGISTRATIONS/ <br />CERTIFICATIONS <br />Professional Engineer, California, <br />No. C 89535, 2019 <br />RESUMES 25K.150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.