FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E
<br />RFP NO.: 10-110
<br />Tyler Para, PE
<br />Design Engineer
<br />Project Role: Roadway Design Engineer
<br />Mr. Parra has experience in the design of and preparation of construction documents for roads, highways,
<br />bike paths, and parking areas, including signing and striping plans. His design experience also inclused
<br />sewer, water, and storm drains. Mr. Parra has comprehensive knowledge ofAutoCAD Civil3D,AutoCAD,
<br />GIS, as well as various hydraulic/hydrologic analysis software programs to solve complex engineering
<br />issues and to analyze the interaction of utilities, grading, and drainage during the design process. He
<br />is experienced in WaterCAD, Storm CAD, FlowM aster, HEC-RAS, HEC HMS, EPA SWMM, HCS 2010 and
<br />MATLAB programming.
<br />EXPERIENCE
<br />Orangethorpe Avenue Widening, Phase II, Indiana
<br />Avenue to Kass Drive, City of Buena Park, Buena
<br />Park, CA. Design Engineer responsible for the
<br />development of plan and profile, geometric design,
<br />conceptual striping plans, drainage, utilities research
<br />and relocation. Tetra Tech is providing topographic
<br />surveys, plans and profile design sheets, traffic control
<br />sheets, striping sheets and cross -sections for street
<br />widening along the south side of Orangethorpe Avenue.
<br />Caruthers Park Stormwater and Urban Runoff
<br />Capture Project, Bellflower, CA. Design Engineer
<br />responsible for development of the site improvements,
<br />diversion structure, pretreatment, underground
<br />storage reservoirs, and pipingsystems. The project
<br />diverts water from a major flood control channel to
<br />a pretreatment structure to remove debris from the
<br />runoff, and an underground structure to infiltrate or
<br />capture the water that will be treated for landscape
<br />irrigation use.
<br />Upper San Gabriel EWMP Stormwater Capture
<br />Projects, City of Industry, Various Locations, CA.
<br />Design Engineer responsible for the development of the
<br />site improvements, diversion structure, pretreatment,
<br />underground storage reservoirs, and piping systems.
<br />Tetra Tech evaluated seven potential site locations
<br />for the development of the Upper San Gabriel EWMP
<br />Stormwater Capture Project. The project components
<br />will include a diversion structure to divert water from
<br />one of the major flood control channels, a pretreatment
<br />structure to remove debris from the runoff, and an
<br />underground structure to infiltrate or capture the water
<br />that will be treated for landscape irrigation use.
<br />California State University Long Beach, Lot 7 Parking
<br />Area Renovation, Long Beach, CA. Design Engineer.
<br />Development of site plans, parking stall, curb and gutter
<br />configurations, drainage, grading, and retaining walls.
<br />The University developed a conceptual plan showing
<br />the reconfiguration and renovation of Parking Lot 7 to
<br />increase the total number of spots, improve circulation,
<br />and create an enhanced entrance to the southeast
<br />portion of the campus. Tetra Tech was contracted to
<br />prepare final construction plans including precise
<br />grading, storm drain improvement plans, preparation
<br />of hydrology and hydraulic calculations for the site
<br />drainage, curb, gutter, and sidewalk designs.
<br />Patton Basin Drainage Outlet, City of San
<br />Bernardino, Public Works Department, San
<br />Bernardino, CA. Design Engineer responsible for
<br />hydrology and hydraulic calculations, site plans,
<br />development of 48-inch drainage pipe and outlet
<br />plan and profile. Tetra Tech is providing preliminary
<br />engineering design including site investigation, data
<br />collection, hydrology and hydraulic analysis to repair
<br />the badly damaged drainage system caused by years
<br />of excessive discharges in combination with surface
<br />runoff which led to the undermining of 48-inch RCP and
<br />collapse of the outlet system and concrete chute off of
<br />Victoria Boulevard.
<br />RESUMES 2W.49
<br />
|