Laserfiche WebLink
FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO.: 10-110 <br />Tyler Para, PE <br />Design Engineer <br />Project Role: Roadway Design Engineer <br />Mr. Parra has experience in the design of and preparation of construction documents for roads, highways, <br />bike paths, and parking areas, including signing and striping plans. His design experience also inclused <br />sewer, water, and storm drains. Mr. Parra has comprehensive knowledge ofAutoCAD Civil3D,AutoCAD, <br />GIS, as well as various hydraulic/hydrologic analysis software programs to solve complex engineering <br />issues and to analyze the interaction of utilities, grading, and drainage during the design process. He <br />is experienced in WaterCAD, Storm CAD, FlowM aster, HEC-RAS, HEC HMS, EPA SWMM, HCS 2010 and <br />MATLAB programming. <br />EXPERIENCE <br />Orangethorpe Avenue Widening, Phase II, Indiana <br />Avenue to Kass Drive, City of Buena Park, Buena <br />Park, CA. Design Engineer responsible for the <br />development of plan and profile, geometric design, <br />conceptual striping plans, drainage, utilities research <br />and relocation. Tetra Tech is providing topographic <br />surveys, plans and profile design sheets, traffic control <br />sheets, striping sheets and cross -sections for street <br />widening along the south side of Orangethorpe Avenue. <br />Caruthers Park Stormwater and Urban Runoff <br />Capture Project, Bellflower, CA. Design Engineer <br />responsible for development of the site improvements, <br />diversion structure, pretreatment, underground <br />storage reservoirs, and pipingsystems. The project <br />diverts water from a major flood control channel to <br />a pretreatment structure to remove debris from the <br />runoff, and an underground structure to infiltrate or <br />capture the water that will be treated for landscape <br />irrigation use. <br />Upper San Gabriel EWMP Stormwater Capture <br />Projects, City of Industry, Various Locations, CA. <br />Design Engineer responsible for the development of the <br />site improvements, diversion structure, pretreatment, <br />underground storage reservoirs, and piping systems. <br />Tetra Tech evaluated seven potential site locations <br />for the development of the Upper San Gabriel EWMP <br />Stormwater Capture Project. The project components <br />will include a diversion structure to divert water from <br />one of the major flood control channels, a pretreatment <br />structure to remove debris from the runoff, and an <br />underground structure to infiltrate or capture the water <br />that will be treated for landscape irrigation use. <br />California State University Long Beach, Lot 7 Parking <br />Area Renovation, Long Beach, CA. Design Engineer. <br />Development of site plans, parking stall, curb and gutter <br />configurations, drainage, grading, and retaining walls. <br />The University developed a conceptual plan showing <br />the reconfiguration and renovation of Parking Lot 7 to <br />increase the total number of spots, improve circulation, <br />and create an enhanced entrance to the southeast <br />portion of the campus. Tetra Tech was contracted to <br />prepare final construction plans including precise <br />grading, storm drain improvement plans, preparation <br />of hydrology and hydraulic calculations for the site <br />drainage, curb, gutter, and sidewalk designs. <br />Patton Basin Drainage Outlet, City of San <br />Bernardino, Public Works Department, San <br />Bernardino, CA. Design Engineer responsible for <br />hydrology and hydraulic calculations, site plans, <br />development of 48-inch drainage pipe and outlet <br />plan and profile. Tetra Tech is providing preliminary <br />engineering design including site investigation, data <br />collection, hydrology and hydraulic analysis to repair <br />the badly damaged drainage system caused by years <br />of excessive discharges in combination with surface <br />runoff which led to the undermining of 48-inch RCP and <br />collapse of the outlet system and concrete chute off of <br />Victoria Boulevard. <br />RESUMES 2W.49 <br />