My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT TETRA TECH INC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
25K - AGMT TETRA TECH INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:55:12 PM
Creation date
1/16/2020 6:20:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Andy Duong, PE <br />Roadway Engineer/Utility Engineer <br />REGISTRATION <br />C73103 <br />EDUCATION <br />2000 / BS / Civil Engineering / <br />University of New Mexico <br />PROFESSIONAL <br />AFFILIATIONS <br />American Society of Civil <br />Engineers (ASCE) <br />Construction Management <br />Association of America (CMAA) <br />Institute of Transportation <br />Engineers (ITE) <br />AAsian American Architects and <br />Engineers Association (Aaa/e) <br />Future Ports <br />Mr. Duong is a highly qualified and accomplished senior Project <br />Manager with over twenty years of experience in executing engineering <br />and potential projects successfully. Possess outstanding communication <br />and analytical skills. Mr. Duong is specializing in infrastructure and <br />transportation engineering proj ects with proven track record and strong <br />desire of providing superior client service and delivery. Mr. Duong has <br />led and performed many management & design efforts in <br />highway/roadway, heavy and light rail, maritime, civil, infrastructure and <br />private development projects for clients throughout Southern California. <br />Experience <br />Los Angeles World Airport -Automated People Mover (APM), Los <br />Angeles, CA <br />The Landside Access Modernization Program includes five major <br />elements including the APM, which will connect three on -airport stations <br />to local rail and transit services; a consolidated rent -a -car center <br />(CONRAC); two Intermodal Transportation Facilities (ITF); and <br />roadway improvements. The APM will directly benefit airport users and <br />the community by vastly improving mobility and access at the airport. <br />The APM system will include six stations and up to nine electric <br />powered trains, each with four cars, in simultaneous operation. The <br />APM trains will travel on an elevated 2.25-mile long guideway, easing <br />access into and out of the second busiest airport in the United States <br />(LAX) and connecting travelers to LA Metro's Crenshaw Light Rail <br />Line, intermodal transportation facilities and a consolidated rental car <br />center. As the Project -wide Drainage Lead and as project manager from <br />The Alliance Group Enterprise, Inc., Mr. Duong is responsible for <br />leading a technical team to provide design services in the area of <br />drainage, hydrology, Low Impact Development (LID) design, street and <br />site lighting design as part of the street improvements and new roads <br />construction. He is also involved in the utility investigations, evaluation <br />and relocation processes and has been working very closely with various <br />city departments such as LABOE, LADOT, LABOS, LACFCD along <br />with LAWA staffs and design team on various design submittal <br />packages. <br />City of Los Angeles -Bureau of Engineering (LABOE), Sixth Street <br />Viaduct Division — Active Transportation Program Cycle 2 and <br />Cycle 3 Projects (ATP 2 and ATP 3), Los Angeles, CA <br />The proposed projects are funded through ATP Cycle 2 and 3 for <br />projects located in Boyle Heights and Downtown Arts District. The <br />projects are to improve pedestrian infrastructure including new <br />sidewalks, sidewalk repairs, and installation of pedestrian lighting, <br />continental crosswalks, and ADA curb ramps with curb extensions to <br />improve connectivity within community and to the Sixth Street Viaduct <br />Replacement Project. ATP Cycle 3 project also provides new cycle <br />tracks / bike lanes / bike routes with new traffic -controlled intersection <br />and a new shared street connecting to the new Sixth Street Viaduct Art <br />25K-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.