My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC
Clerk
>
Contracts / Agreements
>
P
>
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 2:56:47 PM
Creation date
1/29/2020 11:15:07 AM
Metadata
Fields
Template:
Contracts
Company Name
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC
Contract #
A-2020-005
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/21/2020
Expiration Date
12/31/2024
Insurance Exp Date
11/1/2024
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9,0 TRAFFIC CONTROL <br />9.1 The Contractor will not interrupt traffic flow on City streets without obtaining a no -fee <br />permit from the City. Prior to performing maintenance activities where Contractor <br />employees work immediately adjacent City vehicular lanes or any other situation covered <br />under the California MUTCD, the Contractor shall implement no -fee permitted City <br />approved traffic safety plans to protect the health and welfare of its employees and the <br />general public prior to commencement of the agreement. <br />10.0 MONTHLY REPORTS <br />10.1 Prior to the f rst of each month the Contractor shal I submit to The Director's Representative <br />for approval: <br />10.1, I The Excel Park Maintenance Inspector's Inspection Schedule including a detailed <br />atu ual, monthly, weekly and daily work schedules consistent with task frequencies <br />in Exhibit A; <br />10.1.2 A copy of certified payroll sent to the Department of Industrial Relations on the <br />required format/1'oras of employees assigned to the contract areas; <br />10. L3 An updated organizational chart, or equal, listing the names, titles, schedules and <br />number of Full -Time Equivalent (FTE'e) assignments of all persons working in the <br />contract areas; <br />10.1.4 Invoices and packing slips of name, type and quantities of commodities purchased; <br />10.1.5 Green Waste recycling report including tonnage and name/location of the green <br />waste recycling plant. <br />The information contained in the above referenced documents shall be updated with any <br />new information as changes occur. The Director's Representative shall be immediately <br />notified of any changes to the above information, <br />Failure to submit a report by the first of each month shall result in a fine of $100,00 per <br />day for each report submitted late. <br />11.0 WATER CONSERVATION & PROGRAMMING OF CONTROLLERS <br />11.1 The City shall be responsible for programming irrigation controllers and conserving water. <br />The Contractor shall be responsible for all repairs to lateral lines, rotors/heads/fittings. <br />12.0 SPECIFICATIONS INTERPRETATION <br />12.1 The intent of these specifications is known by the City of Santa Ana and SAPRF. Any <br />questions relating to the interpretation of these specifications must be addressed, in writing, <br />prior to the stars: of work. The Contractor agrees that interpretations of this contract after <br />the start of work are at the sole discretion of the Director's Representative, and the <br />Contractor shall abide by all such interpretations <br />13.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br />13.1 The Contractor shall exercise due care in protecting from damage all existing facilities, <br />structures, and utilities, both above surface and underground on the City's property. Any <br />City of Santa Ana RFP 19-093 <br />Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.