tA4 1.3 Contractor shall coordinate with the Irrigation Consultant to irrigate the <br />causal turf in order to allow greater penetration for aerator. <br />1 AAA Turf shall be aerated using the Kubota L5060 tractor equipped with turf type <br />tires AerWay aeration equipment with AerWay Shattertine tines, <br />Contractor shall make two -passes in. different directions per the Director's <br />Representatives direction. <br />14.1.5 Contractor shall coordinate with the Irrigation Consultant to confirm all <br />irrigation has been tested and restored. to original design specifications prior <br />to overseeding. <br />1.4.1.E Once the irrigation Consultant verifies the irrigation system is working <br />efficiently, the Contractor shall overseed the turf using Stover Seed <br />Company's AZ-1 Kikuyugrass at a rate of 30 pounds per acre, During the <br />germination period, the Contractor shall assume responsibility for <br />programming the irrigation controller(s) to assure 100% germination of <br />seed, <br />1.4.1.6 Immediately after overseeding the Contractor shall coordinate with the <br />Irrigation Consultant to program irrigation controllers to irrigate the seeded <br />areas. The irrigation programs shall be set to maximize germination of seed, <br />1.5 Sport/Pxiority Turf Renovation-Overseeding <br />1.5.1 overseeding shall be renovated-overseeded each year per the Sport/priority Tuff <br />Annual Schedule. All seed quantities and type specified shall be verified by the <br />Director's Representative prior to any applications. The process for renovation- <br />overseeding shall be as follows, <br />1.5.1.1 Contractor shall install a 6' high temporary construction fence around the <br />sport/priority turf areas ,prior to conunencing renovation-overseeding worlc, <br />Note, the fence shall be installed on the perimeter of the sport/priority turf <br />to be renovated-overseeded in accordance with the park map depicting the <br />sport/priority turf areas, <br />1.522 Turf shall be mowed down to K". All turf clippings shall be removed. <br />1.52.2 Turf shall be acrated using the Kubota L5060 tractor equipped with turf type <br />tires AerWay aeration equipment with AcrWay Shattertine tincs, <br />Contractor shall make two -passes in different directions per the Director's <br />Representatives direction. <br />1.5.2.3 Turf shall then be vorticut using the Kubota L5060 tractor equipped with <br />turf type tires and the Trilo VCU 200 Verticut implement. Following <br />verticutting all turf clippings shall be removed. <br />1.5.2.4 Contractor shall coordinate with the Irrigation Consultant to confirm all <br />irrigation has been tested and restored to original design specifications prior <br />to overseeding. <br />1.5.2.6 Once the Irrigation Consultant verifies the irrigation system is working <br />efficiently, the Contractor shall overseed the turf using a) Stover Seed <br />Company's Grand Slam FS in the fall/winter at a. rate of 350 pounds per <br />acre; and, b) Stover Seed Company's Pro Sportfietd Extreme in the <br />spring/sunvner aft a rate of 65 pounds per acre. Contractor shall overseed <br />all turf using the Kubota L5060 tractor equipped with turf type tiros and the <br />Tycrop'1'D-460 QuickPass top -dresser. <br />City of Santa Ana RFP 18-092 T <br />Page 15 <br />