My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES
Clerk
>
Contracts / Agreements
>
D
>
DMS FACILITY SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 2:50:36 PM
Creation date
1/29/2020 11:19:27 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS FACILITY SERVICES
Contract #
A-2020-001
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/21/2020
Expiration Date
12/31/2024
Insurance Exp Date
10/1/2024
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5.2,6 Immediately after overseeding the Contractor shall apply A" minus STA <br />approved compost topper from R&S Soils to all turf using the Kubota <br />L5060 tractor equipped with turf type tires and the Tycrop TD-460 <br />QuiMass top -dresser. Topper material shall be applied at a rate of 35 cubic <br />yards per acre mixed with California Organic 7-1-2 Phyta Boost organic <br />fertilizer at a rate of 600 pounds per acre (35 c.y. top dress mix/600# 7-1-2 <br />organic fertilizer), <br />1.5,2.7 Immediately following applying topper the Contractor shall coordinate with <br />the Irrigation Consultant to program irrigation controllers to irrigate the <br />seeded areas. The irrigation programs shall beset to maximize germination <br />of seed, Once the renovation process is complete, the Irrigation Consultant <br />shall retake control of the irrigation programming. <br />1.6 Overseeding Germination Guarantee <br />1.6.1 The Contractor shall guarantee 100% uniform germination within 10 weeks from <br />the time the first application of seed or wilt sod any thin or bare areas with "thick <br />cut" (thickest available cut) West Coast Turf Improved Kikuyu during warm season <br />and West Coast Turf Improved Kikuyu Sod that has been "cropped over" with <br />perennial rye grass. Renovation must be completed within tluee months of field <br />closure. The Director's Representative shall determine the quantity of thick cut sod <br />needed to achieve 100% coverage. <br />1.7 Replanting <br />1,7.1 Should turf begin to stress or die back for any reason, or become thin in appearance, <br />the Contractor shall immediately apply supplemental water to hydrate the affected <br />area(a). The Contractor shall also meet with the Irrigation Consultant and <br />coordinate the irrigation programming to germinate seed, The Contractor sball then <br />overseed these turf areas using Stovers Seed Company AZ1 Kilcuyugrass <br />(spring/sammer) or Stovers Grand Slam FS (fall/winter) seed at the manufacturer's <br />recommended rate and process. The Contractor shall use STA approved 1 /2" minus <br />compost seed topper at a rate of 35 cubic yards per acre pre mixed with California <br />Organic 6-1-2 Kickstart fertilizer at a rate of 600 pounds per acre. <br />1.7.2 Should the Contractor's seed germination effort fail within four (4) weeks of effort, <br />the Contractor shall install thick out sod to those turf areas using West Coast Turf <br />Bandera Bermuda cropped over with perennial rye grass (fall/wiutcr) and West <br />Coast Turf Bandera Bermuda (spring/summer). <br />1.7.3 The Contractor understands and accepts that at the beginning of the agreement there <br />may be existing turf areas that are thin or bare. The Contractor, by entering into <br />the agreement, shall routinely and at no extra cost to the City, repair thin or bate <br />turf areas by overseeding or sodding with approved seed or sod until a thick healthy <br />stand of turf is established. <br />1.7.4 The Contractor also understands and accepts that park areas are very heavily used, <br />including increased 'tbot traffic, and other uses and, therefore, acknowledges that <br />he/she will immediately respond to thin or bare areas in turf without delay. <br />City of Santa Ana RFP 19-092 <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.