Laserfiche WebLink
Proposal for <br />Roadway Design Engineer <br />Tyler Para, PE <br />Mr, Parra is proficient in the design <br />and preparation of construction <br />documents for transportation, <br />cornmercial:developThem sewer, water, <br />and storm drains, as well as improvement plans <br />for geometric design of roads, highways, bike paths, <br />and parking areas, including signing and striping <br />plans, Mr. Parra has comprehensive knowledgeof <br />AutoCAD Civil gD; AutoCAD, GIS, as well as various <br />hydrauhiq/hydrologic analysis software programs to <br />solve complex. engineering issues and.to analyze the <br />interaction of utilities, grading, and drainage during <br />the: design process. <br />RELEVANT EXPERIENCE: <br />Santa Ana Lincoln Avenue Pedestrian Connectivity Pathway <br />Culver Boulevard Corridor Realignment <br />Boyle Heights Pedestrian Linkages Active Transportation Project <br />(ATP 2) <br />Gcangethorpe Avenue Improvements; City o(Buena Park <br />Drainage/Water Quality <br />Chris Jansen, PE, LEER GA <br />q*sitormwater <br />Mr, Jansen is a civil design engineer <br />with experience working on <br />transportation and stormwater <br />capture.projects, and designing detention and infiltration <br />Best Management Practices (BMP) <br />throughout Los Angeles County, His experience <br />includes researching existing utilities; performing <br />hydraulic and hydrologic design calculations; <br />estimating project costs, drafting, writing technical <br />reports and memorandums, and preparing project <br />specifications,. <br />RELEVANT EXPERIENCE: <br />Silver Lake ReservoirStornnvater Capture Project, City Wes <br />Angeles <br />Culver6oulevard Stormwatefinfiltration and Retention Project, City <br />Of Culver City <br />StormwaterUse Standards for Penmar,Temescal, and Mar Vista <br />Proposition O Projects, Clay of Los Angeles <br />Vista Canyon Regional Transit Center City of Santa Clara <br />Lakewood Stormwator Capture and infiltration Projects at Bolivar <br />Park and Mayfield Park, City of Lakewood <br />Traffic/Signalizatiop <br />Andy Dnong PE <br />Mr. Duong is a highly qualified and accomplished <br />senior Project Manager with over twenty years of <br />experience in infrastructure and transportation <br />engineering projects. He brings a proven track record <br />of superior client service and delivery. Mc Duong has <br />led and performed many management <br />and design efforts in highway/roadway, heavy arid <br />light rail, noaritime, civil, infrastructure and private <br />development projects for clients. throughout Southern <br />California. He is a member of the Institute of <br />Transportation Engineers, <br />RELEVANT EXPERIENCE: <br />Los AngelesWorfdAirport People Mover, Los Angeles, CA <br />City at Los Angeles -Bureau of Engineering (LABOE), Sixth Street <br />Viaduct Division - Active Transportation Program Cycle 2 and Cycle <br />3 Projects (ATP2 and ATP 3), Los Angeles; CA <br />City of Los Angeles -Bureau of Engineering (LA HOE) -Sixth Street <br />Viaduct Division, Sloth Street Replacement Project (CMGC), <br />Los Angeles, CA <br />Los Angeles County Metropolitan Transportation Authority <br />(LACMTA), Orange tine RRT%LRT Project Los Angeles, GA <br />CITY of 5ANTA ANA 2 51K4 3 <br />