Laserfiche WebLink
lioppss;tl fir <br />Understanding of Need continued <br />in Southern California for the last1.3 years. He is <br />supported by an experienced team of engineers, <br />designers, and landscape architects', <br />Mr, Schreiner will meet with the City's Project <br />Manager and the project: design team (PDT) to <br />discuss all aspects of the tasks, goa Is, objectives, <br />and expectations, He will then prepare a project <br />management plan with.a work plan, including a well- <br />defined scope of'work, staffing plan, stakeholder list, <br />schedule, and budget for the City Project Manager's <br />review and approval. Following approval, the Toro <br />Tech team will commence work lay implementing <br />our proven work plan, systems, and procedures in <br />accordance with the contract. <br />Mr. Schreiner will ensure that all subconsultant staff <br />are performing according to the City's expectations. <br />The City will benefit from our team's ability and flexi- <br />bility,y to match your project schedule with our eaten- <br />sive skilled resources. We ate familiar with and will <br />adhere to the City's project delivery and design re- <br />quirements, as well as the applicable Caltrans and <br />County of Orange standards and requirements. As we <br />have executed this type of project many times be- <br />fore, we know the .estimated projectschedule for <br />completion of similar active transportation projects <br />design to bid -ready PS&E, <br />The.;stakeholders and reviewing parties for the <br />project may include the City, Caltrans, and the local <br />community. Plan checks will be provided by the City <br />of Santa Ana. Tetra Tech will recommend and provide <br />a list of entities that must be coordinated with <br />for proper completion of this project. Additionally, <br />reviews by utility companies and other entities and <br />agencies will be coordinated by Tetra Tech, <br />PROCESSTHE DESIGN <br />a � t� <br />The approach for this project will follow Tetra Tech's <br />well -established procedures utilized for similar <br />design projects. We will first perform a thorough <br />review of the project documents developed to. <br />date:and obtain available record drawings and <br />reports, Our initial meetings will identify the City's <br />goals for the project and will be used to clearly <br />define the envisioned balance between pedestrian <br />hardscape Improvements and Green Streets related <br />improvements, We will schedule a site walk with the <br />City's Project Manager and others to gain further <br />Insights, understand specific needs, document visi- <br />ble conditions relevant to the design, and identify <br />project issues, opportunities, and constraints, <br />Following the proposed field work, including the <br />topographic survey, our design team will begin to <br />develop the conceptual plan for the improvements In, <br />close collaboration with the City's Project Manager, <br />The conceptual plan will account for the unique <br />characteristics of the various sections, incorporate <br />elements that will transform them to a functional, <br />ADA compliant, and memorable pedestrian <br />experience, identify opportunities forcostsavings, <br />provide options for hardseape configurations,: propose <br />Green Streets BMPs, highlight utility conflicts, and <br />correct safety concerns; <br />Once the design options have been vetted by the <br />project team, Tetra Tech will document applicable reg- <br />ulatory requirements; permit requirements, <br />stakeholder needs, project opportunities, and <br />constraints to be used as a basis of design. The basis <br />.of design will be the guide to refine the concept <br />design to a 3Q%submittal level for "review and <br />approval, We'willtookatprojectfpctors,inchiding <br />:community impacts, pedestrian and bicycle detours, <br />Aesthetics, emvironmental clearances, right-of-way, <br />permitting; issues, utilities, access and clearances, <br />value, security, safety, constructability, maintenance, <br />durability, life cycle costs; lead times, availability <br />and construction related issues: The Tetra Tech <br />team understands fundamental project issues and <br />functions, leading to higher quality recommendations <br />early in the design stage that are more useful to <br />the owner. With Tetra Tech's design leadership and <br />engagement of the project team in the process, <br />the community will benefit from a beautiful, safe, <br />user friendly, environmentally friendly, and low <br />maintenanceactive transportation enhancement: <br />Upon City approval of the 30% PS&E, our highly <br />qualified team will proceed with updating the <br />design documents to incorporate City comments <br />and to achieve a 60% submittal "completion level, To <br />accomplish this, we will provide monthly progress <br />prints and reports to keep the City Project Manager <br />engaged and informed. To facilitate the PS&E <br />development, our qualified team includes Registered <br />Engineers who are familiar with civil infrastructure <br />CITY OF SANTA ANA 2 5K-°i°L 5 <br />