My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:31:42 AM
Creation date
1/29/2020 11:23:29 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-012
Agency
PUBLIC WORKS
Council Approval Date
1/21/2020
Expiration Date
1/20/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Antpasa}for <br />Understanding of Ateed corninued <br />deliverables. This keeps rework down, reducing cost <br />and saving time. <br />10� First, the CI,C Manager will conduct a formal <br />review of the deliverable highlighting all reviewed <br />Work and redlining these!, <br />The finat phase is a peer review to produce an <br />independent quality check priorto submittal. This <br />process fixes mistakes, verifies compliaoco with <br />design criteria and codes, and provides feedback to <br />the design team. <br />10, Furthermore, the process is audited to keep the <br />Once the review is finished and verified that all managers accountable for <br />following the quality check <br />redlines have been addressed, the Project Manager process, <br />will review the.set to look for oanstructability and <br />interdisciplinary issues, <br />Environmental Documentation <br />and Permits Including CEOA and <br />NEPA compliance, if required, <br />are to be provided by others. If <br />environmental documentation is <br />required, additional scope and <br />fee can be provided.. <br />• All plan check fees and <br />permitting, fees are excluded and <br />will be paid for by the City. <br />*,Reprographics Is limited to -what <br />is described within the proposal. <br />• Rift -of -entry permits will not be <br />required as ail field work will be - <br />performed within the ROW: <br />• Formal traffic control will not <br />be required to perform the <br />.topographic survey. <br />« All improvements are within the <br />C11tv's Right -of Way, <br />+ The design or engineering of <br />off -site improvements is not <br />anticipated or included. <br />Based upon direction provided <br />bythe City, It has been assumed <br />infiltration BM Ps will not be <br />installed by the project. BMPs <br />will consist of proprietary <br />biofiltration BMPs such as the <br />Modular We System by <br />Bic Clean, and the City will <br />approve the use of proprietary <br />biofiltration over infiltration.. <br />Infiltration testing for feasibility <br />screening is not included. <br />a Pavementsectionsshall be' <br />based upon City of Santa Ana <br />standards or shall match existing <br />pavement sections. This proposal <br />does not include geotechnical <br />testing for pavement section <br />recommendations, if required, <br />testing and recommendations <br />can be provided for an additional <br />scope and fee, <br />Regularly scheduled construction <br />observations during <br />the construction. support phase <br />are specifically excluded from <br />the scope of work. <br />Construction drawings will be <br />prepared in AutoCAD Civil 0 <br />and converted to MiteoStation <br />V8i CARD for the final submittal. <br />• Survey and geotechnical <br />construction support services are <br />not included, <br />The preparation of a Stmmwater <br />Pollution Prevention Plan <br />(SWPPp) has not been included <br />within the scope of work. <br />*Work within the medians is ex- <br />cluded from the scope of work. <br />Work within the roadway is to be <br />limited to the travel lane adjacent <br />to the proposed sidewalk widening. <br />+ No street Lighting design and/or <br />coordination is indradod as part <br />of this scope but can be provided <br />as this <br />scope item. <br />• It 'is'assumed that traffic <br />signal as-builts for the.oxisting <br />intersections: are not avallable,in' <br />CAD format, <br />Video detection and bike <br />detection design is not included <br />as part of this scope, <br />• No CCTV, intercorirrect and/or <br />fiber optic design is considered <br />part ofthis .scope butcan be <br />provided asseparatescope item, <br />• Np,signal timing analysis and/ <br />or signal warrant analysis is <br />included as part of this scope. <br />No signal programming and/ <br />or:controller/ nfrastruc"ture <br />Inspection is anticipates{ as part <br />of this "scope.: <br />No traffic counts/traffic survey <br />and/or traffic study is included as <br />part of this scope. <br />• Traffic modeling is not included <br />as part of this scope, <br />01TYot SAN`tA AANA 2 SK12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.