My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:31:42 AM
Creation date
1/29/2020 11:23:29 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-012
Agency
PUBLIC WORKS
Council Approval Date
1/21/2020
Expiration Date
1/20/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposalt rot <br />References <br />Please refer to the client references provided in the priordesceiption of relevant projects. <br />The qualified Tetra Tech Team will provide the services <br />as listed in RFP No. 19-110 and as further described <br />below'to the City's satisfaction while employing best <br />industry practices and best management practices, In <br />general, the'Tetra Tech team will prepare construction <br />plans, specifications and an engineer's cost estimate <br />for the First $t Pedestrian Improvements Project <br />between Flower St and Standard Ave, <br />COORDINATION <br />Tetra Tech will be fully responsible for the overall <br />management and coordination for the project, <br />Including organizing and coordinating the project <br />kick-off and on -going teamieetngs„serving as the <br />liaison with affected agencies and utility purveyors, <br />preparing progress reports and schedule updates, <br />securing permits for all field studies and other <br />required permits from other agencies, and providing <br />oversight so that state -level ATP Grant funding <br />requirements are regularly met, Our team will <br />be coMpletelyengaged with the City throughout <br />the duration of the Project. Project meetings and <br />reporting requirements will generally consist of: <br />Kick -tiff Meeting — Following award of contract, <br />Tetra Tech will schedules project kickoff meeting <br />between Citystaff and key team members followed <br />by a site walk. Tetra Tech will provide an agenda <br />in advance of the meetingand distribute meeting <br />minutes for City review following the meeting. <br />Milestone Meetings A total of four (4) meetings will <br />be scheduled taoccur following each:of the milestone <br />submittals. Tetra Tech will provide an agenda in <br />advance of each meeting and distribute meeting <br />minutes for City review following each meeting. <br />Teleconference Meetings— A tota I of five (5) <br />teleconference progress or coordination meetings <br />have been assumed. <br />Progress Reporting -Progress Reports will be <br />regularly submitted to the City and with all Invoices. <br />Invoices will include the State's project number and <br />City's Activity Code(is) with a summary of work billed <br />for in the current invoice, a summary of all work billed <br />previously and as compared to the remaining project <br />budget. <br />Project Schedule - Tetra Tech will prepare the project <br />schedule in Microsoft Project format utilizing the <br />Caltrans.Work'Breakdown Structure (WBS). The <br />project schedule will be updated and distributed <br />at the kick-off and milestone meetings. The project <br />schedule will show key tasks and subtasks. <br />Prior to the development of the PS&E, the following <br />pre -design services will be performed. <br />♦..a r r ': I M � <br />Tetra Tech willlconduct on site investigations to <br />evaluate existing field can and research' <br />right of way and utility information pertinent to the <br />project Including utility plans, as -built plans and <br />record drawings, and right-of-way data. Tetra Tech <br />will identify existing and proposed facilities within the <br />project"s limits and potential conflicts. If utility con <br />flicts are identified, Tetra Tech may recommend <br />potholing of, utilitiesas an optional scope item, Utility <br />conflict plans and notices will be prepared and sent to <br />utility purveyors to coordinate and resolve potential <br />conflicts, At minimum, Tetra Tech will coordinate <br />with all utilitiesandagencies registered with DlgAlert <br />in the project limits. The listwill be supplemented <br />with other utility agencies listed on the City's latest <br />utility contact list. Upon completion of this task, <br />an existing utility and right-of-way base map will be <br />prepared for use in the Final Design. <br />l <br />Tetra Tech will perform the required topographic and <br />property line surveys for the project area along First <br />St. within the public right-of-way. The westerly limits <br />of the survey will extend 100 feet past.the curb return <br />at intersection with Olive St, and the easterly <br />limits will extend 100 feet past the curb return at the <br />intersection with Standard Ave. The northern and <br />CITY Or,ANTA ANA _ 2SKaW <br />
The URL can be used to link to this page
Your browser does not support the video tag.