southern limits of survey ataR remaining intersections
<br />a long the limit of work will extend 100 feet past the
<br />curb returns at each intersection, The topographic
<br />survey will identify horizontally and vertically existing
<br />facilities and features within the limitof work inelud,
<br />ing:median islands, trees, curb & gutter, curb ramps,
<br />curb returns, sidewalk, driveways, bus pads, grade
<br />breaks, right-of,way, manholes, utility vaults
<br />and boxes, utility cabinets and equipment, street
<br />and traffic lights, utility poles, fire hydrants, drainage
<br />structures, survey monuments, street furniture,
<br />signage, fencing, and building faces constructed in
<br />close proximity to the right-of-way. Storm drain catch
<br />basin and manhole will be dipped to record invert
<br />elevations where manholeJids are not bolted down.
<br />The dipping of sewer manhole and other utility struc-
<br />tures is not included in this scope of work, In addition
<br />to the above items, centerline crosstsectionswill be
<br />provided at 100-foot intervals, Contours will be dis-
<br />played at half -foot intervals. It is assumed traffic con-
<br />trol will not be required tor perform the topographic
<br />Survey.
<br />Electronic base maps will be prepared in US
<br />Customary English Units by a *California Licensed
<br />Land Surveyor.. The survey will comply with the City's
<br />guidelines, and the final survey file deliverable will
<br />be provided in MicroStation V8i Computer Aided
<br />Design and Drafting (CADD) format, Survey control
<br />will be tied horizontally to the North American
<br />Datum of 1983 (NAD83) through GPS post processing
<br />constrained to the California Spatial References
<br />Center, Epoch 2017 Control. Vertical control will, be
<br />tied to -the North American Vertical Datum of1988
<br />(NAVD88) by occupation of the nearest City of Santa
<br />Ana or NGS benchmark controlled by that datum. It
<br />the benchmark used is not within site distance of the
<br />Project, a local survey benchmark will be established
<br />for use duringconstruction.
<br />The Property Line surveys will be performed to
<br />establish the limits of the public right-of-way in
<br />the vicinity of the project. Sufficient boundary
<br />monumentation will be recovered to orient
<br />survey boundary.compiled from record documents.
<br />Additional available easements will also be plotted. A
<br />full boundary establishment survey is not believed to
<br />be necessaryand is not included at this time.
<br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E
<br />REP N0 ;10410
<br />TASK 3.0 PS (0%, 60%, Sal, AND
<br />1 0% MMITTALS)
<br />In order to meet the City's expectations, Tetra Tech
<br />will develop>and deliver detailed Plans, Specifications'
<br />and Estimates (PS&E) within four submitta 15, The 30%
<br />PS&E submittal package will be utilized to establish
<br />the conceptual design, The design will continue to be
<br />;developed during the -600J and 959/8 PS&Esubmittals,
<br />The f1nal10OYoo PS&E Will be the final submittal
<br />package developed at a high level of accuracy ready
<br />for project advertisement, Allsubmittal packages will
<br />include a complete set of plans,' specifications, and
<br />cost estimate inclusive of the proposed Improvements
<br />from each discipline covered in this section.
<br />Anticipated Sheet List
<br />#nf
<br />Sheets
<br />Title Sheet
<br />1 Legend, Abbreviations, and Notes
<br />2 TypiSal;Sections
<br />13 (I"::
<br />Roadway Plans and Profiles
<br />M
<br />-
<br />13
<br />Enlarged Curb Return plans
<br />.,
<br />3 (;
<br />Signing and Striping Plans
<br />7
<br />Utility and WQMP Plans
<br />1
<br />Roadway Details
<br />a
<br />I
<br />Signing and Striping Details
<br />3
<br />RA
<br />Utility and 1NQMP Details
<br />9 Traffic Signal Plans
<br />54 t , r `TOTAL SHEETS
<br />Tetra Tech will prepare the civil PS&E for the
<br />project including the resurfacing or reconstruction
<br />of the sidewalks, curb & gutter, driveways, bus
<br />pads, curb ramps, roadway pavement, and street
<br />furniture. Demolition callouts will be added to the
<br />roadway plans to identify existing improvements
<br />to be protected, relocated, or removed in order to
<br />2rYK-133 TETRA TECH