Laserfiche WebLink
southern limits of survey ataR remaining intersections <br />a long the limit of work will extend 100 feet past the <br />curb returns at each intersection, The topographic <br />survey will identify horizontally and vertically existing <br />facilities and features within the limitof work inelud, <br />ing:median islands, trees, curb & gutter, curb ramps, <br />curb returns, sidewalk, driveways, bus pads, grade <br />breaks, right-of,way, manholes, utility vaults <br />and boxes, utility cabinets and equipment, street <br />and traffic lights, utility poles, fire hydrants, drainage <br />structures, survey monuments, street furniture, <br />signage, fencing, and building faces constructed in <br />close proximity to the right-of-way. Storm drain catch <br />basin and manhole will be dipped to record invert <br />elevations where manholeJids are not bolted down. <br />The dipping of sewer manhole and other utility struc- <br />tures is not included in this scope of work, In addition <br />to the above items, centerline crosstsectionswill be <br />provided at 100-foot intervals, Contours will be dis- <br />played at half -foot intervals. It is assumed traffic con- <br />trol will not be required tor perform the topographic <br />Survey. <br />Electronic base maps will be prepared in US <br />Customary English Units by a *California Licensed <br />Land Surveyor.. The survey will comply with the City's <br />guidelines, and the final survey file deliverable will <br />be provided in MicroStation V8i Computer Aided <br />Design and Drafting (CADD) format, Survey control <br />will be tied horizontally to the North American <br />Datum of 1983 (NAD83) through GPS post processing <br />constrained to the California Spatial References <br />Center, Epoch 2017 Control. Vertical control will, be <br />tied to -the North American Vertical Datum of1988 <br />(NAVD88) by occupation of the nearest City of Santa <br />Ana or NGS benchmark controlled by that datum. It <br />the benchmark used is not within site distance of the <br />Project, a local survey benchmark will be established <br />for use duringconstruction. <br />The Property Line surveys will be performed to <br />establish the limits of the public right-of-way in <br />the vicinity of the project. Sufficient boundary <br />monumentation will be recovered to orient <br />survey boundary.compiled from record documents. <br />Additional available easements will also be plotted. A <br />full boundary establishment survey is not believed to <br />be necessaryand is not included at this time. <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />REP N0 ;10410 <br />TASK 3.0 PS (0%, 60%, Sal, AND <br />1 0% MMITTALS) <br />In order to meet the City's expectations, Tetra Tech <br />will develop>and deliver detailed Plans, Specifications' <br />and Estimates (PS&E) within four submitta 15, The 30% <br />PS&E submittal package will be utilized to establish <br />the conceptual design, The design will continue to be <br />;developed during the -600J and 959/8 PS&Esubmittals, <br />The f1nal10OYoo PS&E Will be the final submittal <br />package developed at a high level of accuracy ready <br />for project advertisement, Allsubmittal packages will <br />include a complete set of plans,' specifications, and <br />cost estimate inclusive of the proposed Improvements <br />from each discipline covered in this section. <br />Anticipated Sheet List <br />#nf <br />Sheets <br />Title Sheet <br />1 Legend, Abbreviations, and Notes <br />2 TypiSal;Sections <br />13 (I":: <br />Roadway Plans and Profiles <br />M <br />- <br />13 <br />Enlarged Curb Return plans <br />., <br />3 (; <br />Signing and Striping Plans <br />7 <br />Utility and WQMP Plans <br />1 <br />Roadway Details <br />a <br />I <br />Signing and Striping Details <br />3 <br />RA <br />Utility and 1NQMP Details <br />9 Traffic Signal Plans <br />54 t , r `TOTAL SHEETS <br />Tetra Tech will prepare the civil PS&E for the <br />project including the resurfacing or reconstruction <br />of the sidewalks, curb & gutter, driveways, bus <br />pads, curb ramps, roadway pavement, and street <br />furniture. Demolition callouts will be added to the <br />roadway plans to identify existing improvements <br />to be protected, relocated, or removed in order to <br />2rYK-133 TETRA TECH <br />