My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:31:42 AM
Creation date
1/29/2020 11:23:29 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-012
Agency
PUBLIC WORKS
Council Approval Date
1/21/2020
Expiration Date
1/20/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' NateSchreiner <br />John Wayne Airport, Airport -Wide Certified Access Specialist <br />Assessment, Santa Ana, CA, Mn Schreiner served as project manager <br />for an accessibility assessment of John Wayne Airport. This included <br />coordinating and obtaining security clearance for all field assessment <br />team members,developing the project budget and schedule, <br />programming the portions of the airport to be included in the assessment, <br />managing the day-to-day activities of the staff, which included a Certified <br />Access Specialist (CASp), and serving as the point -of -contact with the <br />client, The field assessment -finished ahead of schedule even with the <br />restrictive security requirements of working in an airport. Mr. Schreiner <br />also performed reviews of all the deliverables intludingthe assessment <br />report and assessment maps. <br />Caruthers Park Stormwater and Urban Runoff Capture Project, <br />Bellflower, cA, Project Manager. Mr. Schreiner is serving as the project <br />manager during the bidding and construction administration phases of <br />this large-scale stormwater project to capture,; infiltrate and reuse urban <br />runoff collected from County drainage facilities adjacent to the park: The <br />project wasptanned as part of the Los Cerritos Channel (LCC) watershed <br />and the Lower San Gabriel River (LSGR) Watershed Management Programs <br />(WMPs). Caruthers Park was identified as a potential high priority site for <br />a regional stormwater capture project for non-stormwater runoff as well <br />as first -flush runoff from wet weather events. The projectcomponents <br />include site improvements; a diversion structure to d ivert water from <br />the fibod control channel, a pretreatment structure to remove trash and <br />debris from the runoff, an underground structure to infiltraterand storethe <br />water that will be treated forlandscape irrigation use, and piping systems. <br />City of Los Angeles Department of General Services, City of Los <br />Angeles Department of Transportation Communications Hub <br />Replacement, Los Angeles, CA. Project Manager for the replacement of <br />Department of Transportation communication hub enclosures around <br />the City of Los Angeles. The hubs and enclosures house critical electrical <br />equipment necessary to control the traffic signals in the surrounding <br />area. The existing hubs are reaching their useful service life and require <br />replacement across'the City. Mr, Schreiner led the civil engineering design <br />and managed the structural engineering team to removethe existing <br />enclosure and replace with a new enclosures and foundations. The <br />project required permitting with the City of LA Department of Building and <br />Safety (LADES). Mr. Schreiner helped navigate the plan check process and <br />obtainingthe necessary permits. <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO,; ID-110 <br />ANs� <br />BS, Environmental Engineering; <br />catifornia Polytechnic State <br />University, San Luis Obispo, 2006 <br />NI i ,. Io> °A� -� <br />�i,.[ <br />Professional Civil Engineer <br />Calffornia No. 74974, 2009 <br />Qualified SWPPP Developef (QSD), <br />Certificate No, C74974 <br />RESUMES 25* 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.