Laserfiche WebLink
Justin Smith <br />enhancements, ADA ramps, new and enhanced crosswalks, and safety <br />features that Include curb pedestrian signals and new pedestrian lighting <br />along all newjimproved walkways. The project will provide nearly4,000 <br />linear feet of new, replaced, and reconstructed sidewalk. The sidewalk <br />improvements wit(include new and reconstructed ADA ramps and <br />crosswalks, providing connectivity to various key community features and <br />adjacent neighboring locations. Vehicle traffic calming improvements will <br />consist of installing a newtraffic signal at the intersection of4th Street <br />and Clarence Street. <br />DTLAArts District Pedestrian and Cyclist Safety Active <br />Transportation Project (ATP 8), city of LosAngetes, Bureau of <br />Engine Miring, Los Angeles, CA. Design Engineer responsible for providing <br />pre -design services and plans, specifications and estimates forthis active <br />transportation project, funded bya Cal-frans ATP grant, The project <br />improvements will provide pedestrian and cyclist improvements Including <br />new cycle tracks, bike laries, bike routes, new and widened, sidewalks with <br />curb :extensions, new traffic -controlled intersections, a new shared street <br />connectingto the new Sixth Street Viaduct Arts Plaza, as Welt as green <br />street elements. The goal of this Caltrans Local Assistance Program funded <br />project is to increase the mobility and safety for non -motorized users to <br />achieve the regional agency's greenhouse gas reduction goals, and aid in <br />the enhancement of the public's health. <br />Soto Street Bridge over Mission Road and Huntington Drive Bridge <br />Removal and Street ImProveirnent Project, City of Los Angeles, <br />Bureau of Engineering, Los Angeles, CA. Design Engineer responsible <br />for providing engineering design support services during construction <br />including existing utility coordination: and responding to requested design <br />changes for the Soto Street Bridge over Mission Road and Huntington, <br />Drive Bridge Removal and Street improvement Project.. <br />Los Angeles River Greenway— West Valley, City of Los Angeles,:CA. <br />Design Supportfor the preparation ofPlans and construction support for <br />a new bikeway along the Los Angeles River channel from Winnetka Avenue <br />to Mason Avenue. The proposed bikeway is inside the channel, requiring <br />modifications to the channelcross section and retaining wall design. <br />Tetra Tech prepared a 2-D hydraulic model to Study the effects the new <br />section will have on waving and ramping patterns, in accordance with the <br />Army Corps of Engineers requirements. The project also includes bikeway <br />plans and profiles, signing and striping, lighting plans, and structural <br />plans for the retaining walls and bikeway: <br />Los Angeles Avenue Raised Median and Landscaping Project, City of <br />Moorpark, Moorpark, CA. Design Engineer responsible for preparing <br />hydrology and hydraulic calculations' for modifications and additions <br />to the storm drain system. Tetra Tech prepared the PS&E and the <br />Environmental Document to construct landscaped Raised Median on Los <br />Angeles Avenue (SR-118) within the City of Moorpark. SR-118 from State <br />Route 23 (SR-23) west to Butter Creek Road serves as a major east -west <br />arterial through the City of Moorpark: Average Annual DajlyTraffic (AADT) <br />through this section of Los Angeles Avenue varies from 22,000 to 40,000 <br />vehicles per day: <br />RRSTSTRELT PEDESTRIAN IMPROVEMENTS. PS&E <br />REPS NO,: 110.110 <br />BS; Civil Engineering,: University of <br />(Nine, 2013 _ <br />Professionpl Engineer, Colifbrnia, <br />No. 85736, 20I61 <br />RESUMES 25* 44 <br />