Laserfiche WebLink
ADDENDUM FOUR <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-6880 <br />SANTAANA BOULEVARD AND STB STREET PROTECTED BIKE LANE <br />Item <br />Ilescrlptlon <br />Qty <br />Unit <br />Unit Price <br />Amount <br />33 <br />'Traffic Sims <br />179 <br />EA <br />$400.00 <br />$ 71,500:00 <br />34 <br />Signing and Striping Removals <br />I <br />LS <br />$ 35,000,00 <br />$ 35,000.00 <br />Traffic Signal Modification <br />35 <br />Traffic Signal and Signal <br />Interconnect (5th St and Main St) <br />1 <br />LS <br />$ 110,000.00 <br />110,000.00 <br />36 <br />Traffic Signal and Signal <br />Interconnect (5th St and Broadway) <br />1 <br />LS <br />$ 1o0,0oono <br />$ 1o0,0oo.00 <br />37 <br />Traffic Signal and Signal <br />Hlterconnect (5th St and Bush St) <br />1 <br />LS <br />$ 05,000.00 <br />$ 95,000.00 <br />38 <br />Video Detection System at 5"' St and <br />Broadway <br />I <br />LS <br />$ 40,000,00 <br />$ ao;000.00 <br />39 <br />Video Detection System at 5"' St and <br />Main St <br />1 <br />L5 <br />$ 4o,0eo.00 <br />$ 40,000.00 <br />40 <br />Video Detection System at 50' St and <br />Bush St <br />1 <br />1,8 <br />$ 40,000.00 <br />$ 40,000.00 <br />41 <br />Install 2"PVC Conduits <br />160 <br />LF <br />$ 60.00 <br />$ 9,600,00 <br />42 <br />Install 3" PVC Conduits <br />60 <br />LF <br />$ 70.00 <br />$ 4,200.00 <br />43 <br />Install 4" PVC Conduits <br />350 <br />LF <br />$ os;0o <br />$ 33,250.00 <br />44 <br />12—SMI?OCable <br />1,225 <br />LF <br />$ 3.00 <br />$ 3,675.00 <br />45 <br />Fusion Spice 1 Strand SMFO <br />2 <br />BA <br />$ 400.00 <br />$ s00.00 <br />46 <br />IP Communication System at 56' St <br />and Broadway <br />1 <br />LS <br />$ 16,aoo.00 <br />$16,o0o,00 <br />A7 <br />CCTV and Ih Communication <br />System at 5 Stand Main St <br />1 <br />LS <br />$ 1a,oco.00 <br />$1a,0oc.00 <br />Landscape and Irrigation <br />48 <br />Landscape ** <br />1 <br />LS <br />$130,000.00 <br />$ 130,000.00 <br />49 <br />Planting of Shrubs and Succulents by <br />OCCC <br />1 <br />LS <br />$ 2,8t6 <br />$ 2,81G <br />50 <br />Irrigation <br />I <br />LS <br />$450,000.00 <br />$450,000.00 <br />51 <br />120 Day Plant Maintenance and <br />Establishment Period <br />1 <br />LS <br />$ 5,oco.00 <br />$ a,000.co <br />P-3 of P.19 <br />