Laserfiche WebLink
ADDENDUM FOUR <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT N0,:17.6880 <br />SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />52 <br />Labor Agreement Oversight <br />I <br />LS <br />$15,000 <br />$ 15,000 <br />53 <br />PCC Pavement with Monolithic Curb <br />(6 thick) with Thickened Edge <br />2570 <br />LF <br />$ tto.00 <br />$282,700.00 <br />54 <br />PCC A-2-6 Curb and Gutter <br />(Modified) with Thickened Edge <br />2695 <br />LF <br />ffi no.00 <br />$ t 07,aoa.00 <br />55 <br />Relocate Sign <br />I <br />EA <br />$ 50o.0o <br />500.00 <br />56 <br />Remove Monument Sign <br />1 <br />EA <br />$1,000.00 <br />$ t,000.00 <br />57 <br />Metal Hand Railing, Type A <br />70 <br />LF <br />$125.00 <br />$8,750.00 <br />58 <br />Truncated Domes <br />360 <br />SP <br />S 30.00 <br />$ t 0,800.00 <br />59 <br />Driveway Approach, Type 13 <br />705 <br />SF <br />$ 16.00 <br />$ 11,280.00 <br />TOTAL BASE BID $ 3,778,880.50 <br />TOTAL BASE BID IN WORDS <br />Three million, seven hundred seventy six thousand, eight hundred eighty dollars and fifty cents. <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any), <br />* The quantity for this bid item is shown for bid comparison only, This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to Increase or decrease the quantity of this item accordingly, <br />f This bid item is considered a Specialty Item per Section 2-3,2 of the Standard Specifications, <br />** This item shall not include planting of shrubs and succulents as they will be planted by <br />Orange County Conservation Corps per proposal in Appendix H <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />P-4 of P-19 <br />