My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consideration of the Modified Project, and no new or substantially more severe adverse environmental effects would <br />occur from implementation of the Modified Project. <br /> <br />Pursuant to CEQA and the State CEQA Guidelines, this Clarification focuses on the potential environmental impacts <br />associated with the Modified Project that might cause a change in the conclusions of the EIR, including significant new <br />information related to new or increased adverse environmental effects. In other words, this document compares the <br />environmental effects of the Project as evaluated in the EIR to those of the Modified Project and considers whether the <br />proposed modifications would result in new or substantially more severe impacts than was disclosed in the EIR. <br /> <br />Specifically, this document analyzes whether a reduction of 240 residential units (a 48.4 percent reduction), a <br />reduction in the height of the proposed structures, and a re-design of the proposed site entrance (as detailed below), <br />the addition of surface level parking, and a lot line adjustment would result in the new or substantially more severe <br />impacts than were identified in the EIR. <br /> <br />As detailed herein, implementation of the proposed Modified Project would not result in any new or substantially <br />greater impacts and no new mitigation measures are required. On the basis of these findings and the provisions of the <br />State CEQA Guidelines, no recirculated EIR is required for the modified multi-family residential project. As required by <br />CEQA Guidelines section 15088.5(e) the analysis throughout this Clarification provides substantial evidence to <br />support these findings. <br /> <br />1.4 Project Location <br />The Project is located at 2525 North (N.) Main Street, in the northern portion of the City of Santa Ana approximately <br />500 feet east of Interstate (I)-5. The site is located on the northeast corner of N. Main Street and Edgewood Road. <br />Regional access to the Project site is provided by I-5 and the N. Main Street exit; and local access to the Project site is <br />provided by N. Main Street and Edgewood Road. <br /> <br />The Project site consists of 6 contiguous parcels that include Assessor Parcel Numbers (APNs): 003-010-028, 003- <br />010-01, 003-010-03, 003-010-025, 003-010-026, 003-010-030 and is located within the U.S. Geologic Survey (USGS) <br />Orange County 7.5 Minute Series Topographic Quadrangle. <br /> <br />1.5 Project Objectives <br />The Project objectives have not been modified. As described by the EIR, the following objectives support the Project’s <br />underlying purpose to develop multi-family residential uses on the Project site and assist with meeting the City’s <br />housing needs: <br />• Redevelop existing underutilized parcels to implement development of new high-quality housing. <br />• Increase high-quality housing near existing employment centers. <br />• Promote an improved jobs/housing balance by locating attractive new housing in proximity to employment <br />centers. <br />• Provide housing in close proximity to commercial areas, freeways, and transit. <br />• Redevelop existing land uses that would utilize existing infrastructure, including: water, sewer, arterial <br />roadways, transit, and freeways. <br />• Implement capital investment to enhance the City’s economic and fiscal viability pursuant to the City of Santa <br />Ana Strategic Plan. <br />• Provide a safe, high-quality, modern residential community with open space and various recreation <br />amenities. <br /> <br />2-124
The URL can be used to link to this page
Your browser does not support the video tag.