My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1 Aesthetics <br />Summary of Impacts Identified in the EIR <br />Viewshed Impacts <br />Section 4.1, Aesthetics, of the DEIR describes that with implementation of the Project, views of the Project site from <br />the adjacent Santiago Park area would change from setback views of the existing 2-story office building partially <br />screened by mature landscaping to that of forefront views of the 5-story residential building, with a landscaped tree <br />buffer directly adjacent to the park. This would result in a significant and unavoidable change in views of the Project <br />site from the park. The difference in scale and height, due to the Project’s location adjacent to the park, and limited <br />visual setback buffer with the proposed landscaping, would result in a substantial difference in scale, height, and <br />property setbacks that is considered significant pursuant to the City’s criteria related to the visual character of the site <br />in comparison to the park. Thus, the EIR determined that the visual change in height, scale, and setbacks from <br />Santiago Park would be significant and unavoidable. (DEIR, pp. 4.1-16 through 4.1-26.) <br /> <br />In addition, the EIR describes that implementation of the Project would result in a significant and unavoidable change <br />in visual scale, height, and setbacks from Edgewood Road and N. Bush Street. The background views of urban <br />buildings would become forefront views, and the proposed size and scale of the Project would substantially increase <br />the overall visual density of the built environment. The difference in visual scale and height with the proposed structure <br />adjacent to the roadway and limited visual setback buffer, would be substantial and considered significant pursuant to <br />the City’s criteria. Thus, the EIR determined that the visual change related to the height, scale, and setback from <br />Edgewood Road and N. Bush Street would be significant. (DEIR, pp. 4.1-21.) <br /> <br />The EIR describes that PDF-1 that would incorporate the existing mature trees located along the eastern Project site <br />boundary and to the extent feasible protect and preserve the existing mature trees within the 15-foot setback along the <br />southern boundary within the 15-foot setback along the southern boundary that were identified as healthy by the <br />Arborist Report. This was determined to reduce the visual impacts of the Project. (DEIR, pp. 4.1-18.) <br /> <br />The EIR also included Mitigation Measure AES-1 that requires measures be implemented to retain and protect the <br />trees along the eastern and southern Project site boundary. This measure was determined to reduce visual impacts. <br />However, even with implementation of PDF-1 and Mitigation Measure AES-1, the EIR determined that the Project <br />would still result in a substantial difference in scale, height, and property setbacks that was considered significant <br />pursuant to the City’s criteria. As a result, impacts related to existing visual character or quality of the site were <br />determined to be significant and unavoidable. (DEIR, pp. 4.1-16 through 4.1-26.) <br />Shade and Shadow Impacts <br />Section 4.1, Aesthetics, of the DEIR describes that the Original Project would not exceed the City’s thresholds for <br />shade and shadow impacts. The EIR determined that shadow-sensitive use areas (where sunlight is important to its <br />function) would not be shaded by project-related structures for more than 3 hours between the hours of 9:00 a.m. and <br />3:00 p.m. between fall and spring, or for more than 4 hours between the hours of 9:00 a.m. and 5:00 p.m. between <br />spring and fall compared to existing conditions. Because these City’s thresholds were not exceeded, impacts related <br />to shade and shadow were determined to be less than significant. (DEIR, pp. 4.1-24 through 4.1-26.). <br /> <br />Comparison of Impacts Associated with the Proposed Modified Project <br />Viewshed Impacts <br />Consistent with the methodology in the EIR, photo-simulations were prepared to demonstrate the degree of visual <br />change that would result from implementation of the Modified Project. The photo-simulations have been utilized to <br />depict, at a realistic yet conceptual level of detail, the proposed conditions from public locations after construction and <br />with 5-years maturity of the proposed landscaping. Figure 7 provides the public viewpoint locations for each of the <br />visual simulations. <br /> <br />2-136
The URL can be used to link to this page
Your browser does not support the video tag.