Laserfiche WebLink
<br /> <br />Table T-10: Year 2040 with Modified Project – Roadway Segment Levels of Service <br /> Without Project With Project <br />Increase in V/C Impact? <br /> Daily Volume <br /> Daily Volume <br /> <br /> Roadway Segment LOS Standard Classification LOS E Capacity V/C Ratio LOS V/C Ratio LOS <br />Santa Clara Avenue <br />1 Broadway to Main Street E 4-Lane Undivided 25,000 10,382 0.415 A 10,662 0.426 A 0.011 No <br />Buffalo Avenue <br />2 Broadway to Main Street D 2-Lane One-Way 12,500 4,770 0.382 A 4,778 0.382 A 0.001 No <br />Main Street <br />3 Town and Country Road to La Veta Street D 6-Lane Divided 56,300 41,530 0.738 C 41,900 0.744 C 0.007 No <br />4 Memory Lane to Town and Country Road E 6-Lane Divided 56,300 34,935 0.621 B 35,434 0.629 B 0.009 No <br />5 I-5 Northbound Ramps to Memory Lane D 6-Lane Divided 56,300 35,210 0.625 B 36,118 0.642 B 0.016 No <br />6 I-5 Northbound Ramps to I-5 Southbound On-Ramp D 6-Lane Divided 56,300 33,033 0.587 A 33,789 0.600 A 0.013 No <br />7 South of I-5 Southbound On-Ramp to 17th Street E 4-Lane Divided 37,500 35,363 0.943 E 35,561 0.948 E 0.005 No <br />La Veta Avenue <br />8 Main Street to SR-22 Westbound Ramps D 6-Lane Divided 56,300 27,533 0.489 A 27,753 0.493 A 0.004 No <br />Town and Country Road <br />9 Main Street to Lawson Way D 4-Lane Divided 37,500 24,459 0.652 B 24,588 0.656 B 0.003 No <br />Memory Lane <br />10 Main Street to Lawson Way E 6-Lane Divided 56,300 12,384 0.220 A 12,491 0.222 A 0.002 No <br />Source: Translutions, 2019. Attachment B. * Exceeds LOS Standards <br /> <br />2-178