My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
2 - EIR18-01; DA18-01; GPA18-06; AA18-10_2525 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:52:36 PM
Creation date
2/13/2020 2:48:40 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Queueing: As described previously, construction of the Modified Project includes changes to the N. Main Street at <br />Walkie Way intersection to provide a left turn into the Project site and changes to the median to provide adequate <br />storage length. Table T-11 provides the queueing in the year 2040 plus Modified Project condition. As shown, all <br />queues are forecast to fit within the storage length, except for the southbound left turn at Main Street and Edgewood <br />Road in the p.m. peak hour with the existing median. An exceedance of the storage length by 11-feet is forecast to <br />occur in the p.m. peak hour without the Modified Project. With Modified Project, the exceedance would increase by 3 <br />feet in year 2040 conditions. As detailed in Section 2, Modifications to the Original Project, the median would be <br />modified to accommodate these queues. Thus, operation of the Modified Project would result in a less than <br />significant impact related to queuing. In addition, this operational condition is improved in comparison to the <br />conditions that would occur from implementation of the Original Project Option A, which included one driveway to the <br />Project site that was sited along N. Main Street, and resulted in a p.m. peak hour queue of 235 feet (71 feet greater <br />than the queue of 164 feet shown in Table T-11). Therefore, no new or greater impacts related to queuing would <br />occur from implementation of the Modified Project. <br /> Table T-11: Year 2040 with Modified Project Queuing <br /> <br />Storage Length (In Feet) <br />Without Project With Project <br /> AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour <br />Intersection Movement Queue Length1 Queue Length1 Queue Length1 Queue Length1 <br />Main Street/Memory Lane NBT 680 294 578 416 590 <br />Main Street/Walkie Way NBL 150 44 53 44 62 <br /> NBT 390 305 381 266 305 <br /> SBL 80 0 1 32 64 <br /> EBL 70 8 19 11 27 <br /> EBR 150 0 0 8 64 <br /> WBL 100 0 1 75 58 <br /> WBR 100 0 1 57 43 <br />Main Street/Edgewood Road-I-5 Ramps NBT 690 101 366 70 382 <br /> SBL 150 99 161 100 164 <br /> WBTL 250 183 114 183 113 <br /> WBR 60 50 23 50 22 <br />Main Street/Santa Clara Avenue-I-5 NB On-Ramp NBT 350 132 151 157 230 <br />Source: Translutions, 2019. Attachment B. <br />Bold = Exceeds storage length <br />1Queues reported are 95th Percentile queue lengths per movement in feet. <br />EBL = eastbound left; EBTL= eastbound through-left turn; NBL = northbound left; NWR = northwest bound right; SBL = southbound left; SBT= southbound turn; <br />SBT2 = southbound second turn; SER = southeast bound right turn; WBTL = westbound though-left turn <br /> <br /> <br />Freeway Segments: As shown in Table T-12, both with and without the Modified Project in Year 2040 condition, all <br />traffic study area freeway facilities would operate at unsatisfactory levels of service E or F except for the I-5 <br />southbound Broadway and Main Street off-ramps in both the a.m. and p.m. peak hours. This is the same condition <br />that would occur with implementation of the Original Project, as shown on DEIR Table 4.11-28. Thus, like the Original <br />Project, the Modified Project would also result in less than significant impacts to freeway segments per Caltrans <br />criteria. <br /> <br />2-179
The URL can be used to link to this page
Your browser does not support the video tag.