Laserfiche WebLink
the transportation solutions company... <br />Existing WP Project Existing Existing WP Project Existing <br />Volumes Adjust. Trips With Project Volumes Adjust. Trips With Project <br />The Addington <br />Table B-1 - Existing With Option E - Main Street and Walkie Way-Santiago Park-Driveway Access <br />AM Peak Hour PM Peak Hour <br />and Discovery Cube Parking Peak Hour Volume Summary <br />12 . Main Street/17th Street <br />NBL 189 0 189 200 0 200 <br />NBT 762 1 763 1,061 4 1,065 <br />NBR 174 0 174 162 0 162 <br />SBL 178 2 180 187 1 188 <br />SBT 1,082 4 1,086 810 2 812 <br />SBR 82 4 86 141 2 143 <br />EBL 141 1 142 199 4 203 <br />EBT 1,250 0 1,250 1,219 0 1,219 <br />EBR 78 0 78 58 0 58 <br />WBL 306 0 306 186 0 186 <br />WBT 1,335 0 1,335 1,064 0 1,064 <br />WBR 16 1 17 59 2 61 <br />North Leg <br />Approach 1,342 0 10 1,352 1,138 0 5 1,143 <br />Departure 919 0 3 922 1,319 0 10 1,329 <br />Total 2,261 0 13 2,274 2,457 0 15 2,472 <br />South Leg <br />Approach 1,125 0 1 1,126 1,423 0 4 1,427 <br />Departure 1,466 0 4 1,470 1,054 0 2 1,056 <br />Total 2,591 0 5 2,596 2,477 0 6 2,483 <br />East Leg <br />Approach 1,657 0 1 1,658 1,309 0 2 1,311 <br />Departure 1,602 0 2 1,604 1,568 0 1 1,569 <br />Total 3,259 0 3 3,262 2,877 0 3 2,880 <br />West Leg <br />Approach 1,469 0 1 1,470 1,476 0 4 1,480 <br />Departure 1,606 0 4 1,610 1,405 0 2 1,407 <br />Total 3,075 0 5 3,080 2,881 0 6 2,887 <br />Total Approaches <br />Approach 5,593 0 13 5,606 5,346 0 15 5,361 <br />Departure 5,593 0 13 5,606 5,346 0 15 5,361 <br />Total 11,186 0 26 11,212 10,692 0 30 10,722 <br />Analysis\Exist TM Santiago - 9/12/2019 <br />2-251