Laserfiche WebLink
the transportation solutions company... <br />Existing WP Project Existing Existing WP Project Existing <br />Volumes Adjust. Trips With Project Volumes Adjust. Trips With Project <br />The Addington <br />Table B-1 - Existing With Option E - Main Street and Walkie Way-Santiago Park-Driveway Access <br />AM Peak Hour PM Peak Hour <br />and Discovery Cube Parking Peak Hour Volume Summary <br />13 . Project Driveway 2-Bush Street/Edgewood Road <br />NBL 58 0 58 85 0 85 <br />NBT 0 0 0 0 0 0 <br />NBR 1 0 1 0 0 0 <br />SBL 0 0 0 1 -1 0 0 <br />SBT 0 0 0 1 -1 0 0 <br />SBR 0 0 0 4 -4 0 0 <br />EBL 2 -2 0 0 0 0 0 <br />EBT 96 0 96 115 1 0 116 <br />EBR 67 0 67 58 1 0 59 <br />WBL 0 0 0 0 0 0 <br />WBT 180 0 180 140 0 140 <br />WBR 0 0 0 0 0 0 <br />North Leg <br />Approach 0 0 0 0 6 -6 0 0 <br />Departure 2 -2 0 0 0 0 0 0 <br />Total 2 -2 0 0 6 -6 0 0 <br />South Leg <br />Approach 59 0 0 59 85 0 0 85 <br />Departure 67 0 0 67 59 0 0 59 <br />Total 126 0 0 126 144 0 0 144 <br />East Leg <br />Approach 180 0 0 180 140 0 0 140 <br />Departure 97 0 0 97 116 0 0 116 <br />Total 277 0 0 277 256 0 0 256 <br />West Leg <br />Approach 165 -2 0 163 173 2 0 175 <br />Departure 238 0 0 238 229 -4 0 225 <br />Total 403 -2 0 401 402 -2 0 400 <br />Total Approaches <br />Approach 404 -2 0 402 404 -4 0 400 <br />Departure 404 -2 0 402 404 -4 0 400 <br />Total 808 -4 0 804 808 -8 0 800 <br />Analysis\Exist TM Santiago - 9/12/2019 <br />2-252