My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />INTRODUCTION AND BACKGROUND <br />The City of Santa Ana is located in the County of Orange in Southern California. The City <br />encompasses 27.2 square miles and a population over 343,000 people. <br />The City of Santa Ana Public Works Agency— Water Resources Division oversees and maintains <br />the daily operations of the Water System and Sanitary Sewer System. The City of Santa Ana's <br />water system has an average day demand of about 43 MG with 45,000 services. It is comprised <br />of approximately 478 miles of water main, 45 MG of storage at 5 sites, 7 MWD connections, 21 <br />groundwater wells, 7 pump stations, 4 pressure regulating stations and utilizes 2 pressure zones <br />The City desires to implement Davit Fall Arrest Systems at various water and sewer facilities. <br />The City is soliciting proposals from qualified firms to provide professional engineering services <br />to provide final design and installation services. The City shall select one firm to provide these <br />services. <br />DESCRIPTION OF PROJECT <br />The Contractor's scope of services shall include the following tasks: <br />Task 1 - Project Management: <br />The Contractor shall conduct a kickoff meeting with the City to discuss the goals and objectives <br />for the project. At this kickoff meeting, project reporting/communication protocols will be <br />established, a project schedule will be provided and key issues will be discussed to establish the <br />project guidelines. The Contractor will prepare and lead all meetings and provide meetings <br />minutes. <br />The Contractor shall conduct at least one project team meetings throughout the project duration <br />and include key City staff as well as key sub-Contractors/consultants. <br />The Contractor shall submit an initial schedule with pertinent milestones for the major tasks <br />involved in the Project. The schedule shall be updated monthly, or more often, as required. <br />Task 2 — Design Services: <br />The Contractor's Engineer shall use the Davit Fall Arrest System Feasibility Study (Exhibit 1) as <br />the basis of final design for each Davit Fall Arrest System installation. Final plans shall modify <br />and/or verify the proposed design, propose any changes and install the system, subject to the <br />review and approval of the City. The Contractor's Engineer shall perform final structural <br />calculations to confirm the adequacy of the existing structures to support the proposed fall arrest <br />systems as well as modifying the anchorage designs provided in Exhibit 1 as necessary. A <br />waterproofing design and final details shall be provided for any wall/roof penetrations where <br />waterproofing is required. The Contractors Engineer is expected to respond to all Requests for <br />Information as needed, subject to the review and the approval of the Water Resources Division. <br />City of Santa Ana - RFP 19-097 <br />25B-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.