My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor's Engineer shall also specify any coatings necessary to protect the system from <br />the elements for the proposed fall arrest system at each installation location. <br />It will be incumbent upon the Contractor to find and review all records, including, but not limited <br />to, the previously referenced "as -built" drawings. The Contractor shall also conduct interviews <br />with appropriate City engineering and operations staff. City staff will assist in the records search <br />as time permits. <br />The Contractor shall provide the following documents to the City: <br />1. Structural calculations and final drawings/details for the davit system <br />installations per site signed by a licensed Engineer in the State of California. <br />2. Provide all documentation, including certifications, to certify the proposed Davit <br />Systems as required by the applicable regulatory agencies. <br />3. Final as-builts of each individual installation. <br />Task 3 — Davit System Installation Services: <br />The Contractor shall provide all materials, installation, testing, certification and related <br />appurtenances for fall arrest protection equipment and systems to be installed. The fall protection <br />system shall be the DBI-SALA Advanced One Piece Adjustable Offset Davit System. The fall <br />protection system shall be installed per the recommendations of Exhibit 1 as well as per the <br />requirements of the final design of each individual installation. The Contractor is expected to <br />coordinate all installations with the Contractor's Engineer for any in -field requests for information. <br />Any potholing or onsite investigation necessary to complete each installation is considered <br />included in this task. <br />System components shall be fabricated and painted at the factory. Where possible, minimal on - <br />site fabrication will be permitted. <br />All installations shall be coordinated with the Water Production Team. Scheduling shall be <br />coordinated with their site operations. <br />at <br />In locations where traffic control is required, the following shall apply: <br />All traffic control, where required, shall conform to the requirements of the latest edition of the <br />"Work Area Traffic Control Handbook" (WATCH, City Standard Plan 1125F (SP1125F), the <br />Manual on Uniform Traffic Control Devices (MUTCD), the current MUTCD California <br />Supplement and these Special Provisions. <br />City of Santa Ana - RFP 19-097 <br />25B-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.