My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25B - AGMT WITH DN TANKS FOR INSTALLATION AND DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:59 PM
Creation date
2/13/2020 4:23:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The Contractor shall maintain at least one open traffic lane in each direction at all time <br />on all streets. Flagmen shall be required when directed by the City. <br />2. During non -working hours, all lanes shall be opened to traffic. <br />3. Flashing arrow boards shall be required on arterial streets. Deviation from this <br />requirement will be subject to approval from the Traffic Engine <br />4. Traffic control plans must be submitted and approved before starting work on any <br />public street, except for the following temporary closures: <br />Temporary single lane closure on 4 or 6-lane arterials may be done per WATCH <br />without submitting a traffic control plan. However, this will require approval from <br />the Traffic Engineer. <br />Temporary closure of local streets may be done per WATCH without submitting <br />traffic control plans. However, this will require approval from the Traffic <br />Engineer. <br />Task 4 — Maintenance and Training <br />The Contractor shall include maintenance for the fall protection system annually for 5 years. <br />Maintenance shall include inspection of the fall protection components, repairs for normal wear <br />and tear, documentation of maintenance provided and certifications of systems as required by <br />applicable regulations. The Contractor/Engineer shall catalogue all the installations and provide <br />an electronic means of storing all pertinent maintenance data, including, but not limited to, <br />maintenance intervals, damage records, maintenance checklists, etc. <br />Within 30 business days after the fall protection system is installed, tested and certified, the <br />Contractor shall provide staff training for use of all the systems. The training shall be scheduled <br />and conducted at the City's request and accommodate the water production staff (11 members). <br />The Contractor shall provide documentation for the training sessions and a program description. <br />For fall protection systems that include anchorage designs that require usage to occur under the <br />supervision of a qualified person as required by California safety regulations, provide training to <br />staff as required for them to be qualified to provide supervision as a qualified person, and furnish <br />documentation of the training provided. <br />Task 5 — Value Added Services <br />The Contractor is invited to identify any additional tasks, inspections, or other services that the <br />Contractor feels should be considered as part of this scope of work. If any value added services <br />are identified, the Contractor shall provide a description of the item as well as a cost associated <br />with this item. The cost will not be considered part of the base fee during the evaluation of the <br />proposals, but may be added at the City's discretion upon award of a contract. <br />---End of SCOPE OF WORK Section. --- <br />City of Santa Ana - RFP 19-097 <br />25B-14 -�Pl <br />
The URL can be used to link to this page
Your browser does not support the video tag.