My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT WITH TESLA SUPERCHARERS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
25F - AGMT WITH TESLA SUPERCHARERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:02:57 PM
Creation date
2/13/2020 4:25:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25F
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Supercharger Station <br />Tesla shall install the Supercharger Station on the Premises pursuant to the terms of this Agreement and <br />the Approved Plans. <br />The "Supercharger Station" shall consist of: (a) necessary utility infrastructure, which may include a utility <br />transformer, metering equipment, conduit, wiring and concrete pads (collectively, the "Infrastructure"); <br />and (b) certain trade fixtures as determined by Tesla, which shall include twenty (20) charge posts <br />("Superchargers" ), power electronics equipment, switchgear and Signage, and may also include, without <br />limitation, fence orothervisual barriers, a canopy, solar panels and an energy storage system (collectively, <br />the "Trade Fixtures"). <br />Signage <br />25F-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.