My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - CUP19-38_542 E CENTRAL AVENUE NOTICE PLANS
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
01-27-20
>
2 - CUP19-38_542 E CENTRAL AVENUE NOTICE PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:26:11 PM
Creation date
2/13/2020 5:25:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedro A. Garcia <br />DP No. 2018-06R <br />Master ID No. 2018-141605 <br />September 27, 2019 <br /> <br /> <br />Page 3 of 15 <br /> <br />Project Overview <br /> <br />Pedro A. Garcia with Pedro and Associates, representing Diocese of Orange, is proposing to construct a <br />new two-story 6,372-square foot rectory and office building on a vacant property located at 542 East <br />Central Avenue. The subject property has a General Plan land use designation of Low Density Residential <br />(LR-7) and has a zoning designation of Single-Family Residential (R-1). The site is located on the <br />southwest corner of Central Avenue and Halladay Street and is surrounded by residential uses to the south, <br />west and east and Our Lady of Guadalupe Delhi church to the north. The project requires approval of a <br />Conditional Use Permit (CUP) by the Planning Commission to allow a rectory and office building within <br />the R-1 zoning district. <br /> <br />I. Prior to Development Project approval, address the following items identified below: <br /> <br />A) Planning Division: <br /> <br />Site Plan Comments <br /> <br />Staff recommends that the overall square footage of the proposed structure be reduced in <br />order to comply with the development standards, parking standards and trash truck pick-up <br />requirements addressed below. <br /> <br />1) Pursuant to SAMC Section 41-1414, rectories require one garage space per <br />bedroom, plus spaces for guest parking equal to twenty-five percent of the total non- <br />guest parking. Revise plans to comply with this requirement. The office component <br />shall be parked at three spaces for each one-thousand square feet of gross floor <br />office area. <br /> <br />2) Pursuant to SAMC Section 41-235 and 41-220, the project requires a five-foot side <br />and rear setback and a 10 foot setback along Halladay Street. In addition, per SAMC <br />Section 41-239, all yard shall be completely landscaped with the exceptions of <br />approved driveways and walkways. Remove parking stalls and trash enclosure <br />encroaching into this area and redesign parking area to comply with these <br />requirements. Remove proposed parking stall No. 11 and relocate bike racks to the <br />front of the building. <br /> <br />3) The project’s landscape must comply with SAMC Section 41-240 and the City’s <br />Water Efficient Landscape Ordinance (WELO). In addition, the front and street side <br />yard setbacks shall comply with the City’s “California Friendly Landscape <br />Guidelines.” Revise landscape plans to comply with these requirements. The <br />Stamped concrete proposed at the front yard is exceeding the 65/35 ratio of <br />landscaping to permeable hardscape (See Attachments A & B). Comment was <br />partially addressed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.