Laserfiche WebLink
71tAFF1C SAFETY & SKaN5 <br />www.stalell-idesa&lv.com <br />CA CONTRACTOR LICENSE 0975518 - CLASS A, C-31, C-32 & C-61/D-42 D1R PW #1000001109 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />{Complete one Section E for each key person.) <br />Branch Manager <br />11 <br />lb. FIRM NAMEANU LOCATION (Cllyend Stale) <br />Statewide Traffic Safety and Signs, Inc. <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />A.S. Business Management I N/A <br />(2) YEAR COMPLETED <br />BrarlvI7 Manager - Garden Grove, CA PROFESSIONAL SERVICES CONSTRUCTION(Ifapplicable) <br />NIA Ongoing <br />I <br />a. <br />(3) BRIEF DESCRIPTION (Brfefscope, size, cost etc.) AND SPECIFIC ROLE ® Check itproject performed with current turn <br />Manages STSSI operations in Garden Grove, California which services Los Angeles and Orange Counties of California. Projects under my <br />management range from construction area signs, traffic design, traffic control, traffic detours, temporary and permanent signage, crash <br />attenuation, and work zone safety. <br />(2) YEAR COMPLETED <br />• •• PROFESSIONAL SERVICES CONSTRUCTION Ofapplicable) <br />11111EWA <br />Ongoing <br />b <br />(3) BRIEF DESCRIPTION (Snefscope. size. cast etc.) AND SPECIFIC ROLE ® Check Hproject performed with cadent firm <br />Branch Manager, Garden Grove <br />On -Call Traffic Control Contract <br />• (2) YEAR COMPLETED <br />• • • F • PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />WA Ongoing <br />c <br />(3) BRIEF DESCRIPTION (19defscops, size. cast, etc.) AND SPECIFIC ROLE ® Check it project perm med wdh current Ilan <br />Branch Manager, Garden Grove <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />-. - • . , . • s • EPROEESS1�01NALSERVICES CONSTRUCTION (Itappriceble) <br />NIA 2016 <br />(3) BRIEF DESCRIPTION tedefscope, size, cost etc.) AND SPECIFIC ROLE ® Check k project perrormed with current firm <br />a. <br />Branch Manager, Garden Grove/Riverside, CA <br />Work included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the 1-405 through the Sepulveda pass from 1-10 to US Route 101, and overall construction cost was >$1 billion. Statewide <br />portion of work was rou hl $55 million. <br />(2) YEAR COMPLETED <br />1, - • =11PROFESSIONAL SERVICES rONSTRUCTION freppllcable) <br />NIA 2017 <br />(3) BRIEF DESCRIPTION (Bnafscope, size, cost, etc.) AND SPECIFIC ROLE ® Check ifproject performed with currentfirm <br />e <br />Branch Manager, Garden Grove/Riverside, CA <br />Work includes permanent roadside signs, POEM'S (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at - $318 million; Statewide subcontracted for - $119K, <br />25E-53 <br />