My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/03/2020
>
25E - AGMT WITH CA BARRICADE RENTAL AND STATEWIDE TRAFFIC SIGNS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 1:26:14 PM
Creation date
2/27/2020 12:52:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
3/3/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�4fiETY jai Sfto11ii5 <br />www.statewidesafet1.corn <br />CA CONTRACTOR LICENSE 9975519 —CLASS A, C-31, C-32 & C-61/13-42 DIR PW #1000001109 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />Traffic Safetv and <br />3. ROLE IN THIS CONTRACT <br />Dispatcher/ Project Manager <br />1g.RELEVANT <br />N/A <br />27 1 7 <br />(1) TITLE AND LOCATION (Ciry ad 3tatej OIL— (2) YEAR COMPLETED <br />Dispatcherl Project PROFESSIONAL SERVICES CONSTRUCTION(Ifapphcable) <br />NIA Ongoing <br />a. <br />(3)BRIEF DESCRIPFION(Bnefscnpe, size, cost ek:JAND SPECIFIC ROLE ® Cherx If praiect performed with current firm <br />Dispatcher Project Manager for STSSI Garden Grave, California which services Los Angeles and Orange Counties of California. Dispatch <br />and coordinate labor, material and equipment for projects relating to construction area signs, traffic design, traffic control, traffic detours, <br />temporary and permanent signage, crash attenuation, and work zone safety. <br />' - (2) YEAR COMPLETED <br />EPROFES-5170NA"ERVICOSI CONSTRUCTION flfappacabre) <br />NIA On oing <br />b <br />(3) BRIEF DESCRIPTION (enafacope, size, cast etc)ANDSPECIFIC ROLE ® Check r project perrormetl with mrrrorn firm <br />Dispatcher / Project Manager, Garden Grove <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />e 1 e PROFESSIONAL SERVICES CONSTRUCTION (Happlicable) <br />N/A Ongoing <br />a <br />(3) BRIEF DESCRIPTION (enefscnpe, srae, cost, ste.) AND SPECIFIC ROLE ® Check if protect performed with current firm <br />Dispatcher / Project Manager, Garden Grove <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />r - . PROFESSIONAL SERVICES CONSTRUCTION (Ifapprcabie) <br />NIA 2016 <br />(3) BRIEF DESCRIPTION (anefscope, size, cost etc.) AND SPECIFIC ROLE Check 0 Projed Performed with current firm <br />d. <br />Dispatcher / Project Manager, Garden Grove/Riverside, CA <br />Work included managed traffic control, Construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the I-405 through the Sepulveda pass from 1-10 to US Route 1D1, and overall construction cost was 41 billion. Statewide <br />ortion of work was rou hl $55 million. <br />(2) YEAR COMPLETED <br />r • _ ' _ e PROFESSIONAL SERVICES ONSTRUCTION (Ifspplicable) <br />e • e - e . NIA 2017 <br />e <br />(3) BRIEF DESCRIPTION (aAefscope, size, cost etc) AND SPECIFIC ROLE ® Check if Project performed with camel firm <br />Dispatcher/ Project Manager, Garden Grove/Riverside, CA <br />Work includes permanent roadside signs, PCBM's (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at- $318 million; Statewide subcontracted for - $119K. <br />25E-54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.