My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DN TANKS INC.
Clerk
>
Contracts / Agreements
>
D
>
DN TANKS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 2:23:40 PM
Creation date
3/4/2020 3:04:44 PM
Metadata
Fields
Template:
Contracts
Company Name
DN TANKS INC.
Contract #
A-2020-021
Agency
PUBLIC WORKS
Council Approval Date
2/18/2020
Expiration Date
2/17/2023
Insurance Exp Date
5/1/2023
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The Contractor shall maintain at least one open traffic lane in each direction at all time <br />on all streets. Flagmen shall be required when directed by the City. <br />2. Durina non-workina hours all lanes shall be opened to traffic. <br />3. <br />Cl <br />a. Temporary single lane closure on 4 or 6-lane arterials may be done per WATCH <br />without submitting a traffic control plan. However, this will require approval from <br />the Traffic Engineer. <br />b. Temporary closure of local streets may be done per WATCH without submitting <br />traffic control plans. However, this will require approval from the Traffic <br />Engineer, <br />Task 4 — Mainten <br />The Contractor shall Include maintenance for the fall protection system annually for 5 years. <br />Maintenance shall Include inspection of the fall protection components, repairs for normal wear <br />and tear, documentation of maintenance provided and certifications of systems as required by <br />applicable regulations. The Contractor/Engineer shall catalogue all the Installations and provide <br />an electronic means of storing all pertinent maintenance data, Including, but not limited to, <br />maintenance intervals, damage records, maintenance checklists, etc. <br />Within 30 business days after the fall protection system Is Installed, tested and certified, the <br />Contractor shall provide staff training for use of all the systems. The training shall be scheduled <br />and conducted at the City's request and accommodate the water production staff (11 members), <br />The Contractor shall provide documentation for the training sessions and a program description. <br />For fall protection systems that include anchorage designs that require usage to occur under the <br />supervision of a qualified person as required by California safety regulations, provide training to <br />staff as required for them to be qualified to provide supervision as a qualified person, and furnish <br />docurn@ntation of the training provided. <br />Th@ Contractor is invlted to Identify any additional t@sks, inspections, or oth@f s@rvic@s that the <br />Contmotor f@@Is should b@ consid@r@d @s part of this §cop@ of work, If any v@lu@ added s@rvic@s <br />af@ id@ntifi@d, the Contractor shall provid@ @ d@scription of th@ it@m @s wall @s @ cost @ssoci@t@d <br />with this it@tn: The cost will not b@ consid@r@d part of the base f@@ during the @valuation of th@ <br />proposals, but may b@ @dd@d at th@ City's disci@tion upon @w@fd of @ contfact <br />..,End of 111C®F11®F WORK f@otion,... <br />@ity @f §aRta Ana : Rhp 1 9=993 <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.