My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DN TANKS INC.
Clerk
>
Contracts / Agreements
>
D
>
DN TANKS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 2:23:40 PM
Creation date
3/4/2020 3:04:44 PM
Metadata
Fields
Template:
Contracts
Company Name
DN TANKS INC.
Contract #
A-2020-021
Agency
PUBLIC WORKS
Council Approval Date
2/18/2020
Expiration Date
2/17/2023
Insurance Exp Date
5/1/2023
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor's Engineer shall also specify any coatings necessary to protect the system from <br />the elements for the proposed fall arrest system at each installation location. <br />It will be incumbent upon the Contractor to find and review all records, including, but not limited <br />to, the previously referenced "as -built" drawings. The Contractor shall also conduct interviews <br />with appropriate City engineering and operations staff. City staff will assist in the records search <br />as time permits. <br />The Contractor shall provide the following documents to the City: <br />1. Structural calculations and final drawings/details for the davit system <br />installations per site signed by a licensed Engineer in the State of California. <br />2. Provide all documentation, including certifications, to certify the proposed Davit <br />Systems as required by the applicable regulatory agencies. <br />3. Final as-builts of each individual installation. <br />Task 3 — Davit System Installation Services: <br />The Contractor shall provide all materials, installation, testing, certification and related <br />appurtenances for fall arrest protection equipment and systems to be Installed. The fall protection <br />system shall be the DBI-SALA Advanced One Piece Adjustable Offset Davit System. The fall <br />protection system shall be installed per the recommendations of Exhibit 1 as well as per the <br />requirements of the final design of each individual Installation. The Contractor is expected to <br />coordinate all Installations with the Contractors Engineer for any In -field requests for Information. <br />Any potholing or onsite Investigation necessary to complete each Installation Is considered <br />Included In this task: <br />System components shall be fabricated and painted at the factory, Where possible, minimal on - <br />site fabrication will be permitted, <br />All Installations shall be coordinated with the Water Production Team. Scheduling shall be <br />coordinated with their sit® operations, <br />In looations where traffic control is required, the following shall apply; <br />All traffic control, where requlr@d, shell confofm to the requirements of the latest edition of the <br />"Work Aw Traffic Control bendbook" (WATCH, City Standard glen 1125F (BP1126F), the <br />Manual on Uniform Traffic Control ®®vices (MUTCD), the current MUTOD Calif®rnia <br />Supplement end these Special PfovNiona. <br />pity ®f §aAta Ang = RI=ID 1fi=993 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.