Laserfiche WebLink
these options in an effort to try and eliminate the need for the City to drain the two concrete <br />reservoirs with precast concrete roofs. <br />DN Tanks proposal pricing includes performingwork inside of the drained tanks in accordance <br />with the preliminary design details. DN Tanks base price in Attachment 2: Fee Schedule does <br />not include the cost of disinfecting the tank, however a breakout price for tank disinfection <br />has been included in an Appendix to the Fee Schedule with additional pricing. <br />We assume that the City will be responsible for all filling and draining of these tanks for the <br />work to be performed. <br />e. Assumptions and Clarifications <br />DN Tanks has assumed the following items in preparing our pricing: <br />1) Tank draining and filling to be provided by the City, <br />2) Cleaning of the tanks is not included In DN Tanks price but can be provided for an <br />additional fee. <br />3) It Is assumed there are no utilities that need to be relocated in order to Install the davit <br />anchor support system as shown In the preliminary feasibility study. Relocation of utilities <br />or design alterations to avoid existing utilities is considered a changed condition, <br />a, DN Tanks will conduct a review of the as=builts and existing site conditions to <br />confirm existing conditions, <br />4) It Is assumed there will be no rock excavation, Rock excavation will be a changed <br />condition, <br />3) special Inspection, If required, to be provided by the City at no cost to DN Tanks, <br />Pap �®f� <br />P <br />