Laserfiche WebLink
the construction of the project. This safety plan is implemented and managed on -site by our <br />Superintendent and includes documented onsite training for all employees on topics such as: <br />the proper use of personal protection equipment, emergency evacuation and rescue, <br />material handling, rigging, crane signaling, heat illness prevention, confined space, fall <br />protection, ladder safety and other topics as required to educate employees on safe work <br />practices for job activities to be performed. Employees will also be trained on the proper use <br />of power tools and equipment. Additionally, all aerial lift or forklift operators on DN Tanks <br />jobsites are required to have current certifications. <br />DN Tanks conducts dally safety meetings and daily stretch and flex programs designed to help <br />employees "loosen up" before work each day, During the morning safety meeting, a task <br />hazard analysis will be reviewed and will be completed with the involvement of the entire <br />crew. On a weekly basis, a 9-page site safety inspection report will be completed and shared <br />with the crew, The site Inspection report Is a complete inspection of all work including <br />excavations, equipment, tools, overall housekeeping, PPE, fall protection, etc, Any hazards <br />that are Identified during the safety Inspection will be fixed immediately, All DN Tanks <br />management staff Including the Project Manager, Superintendent and Foreman have current <br />CPR and First Aid certificates to assist In the event of an Injury, Additionally, all DN Tanks <br />Superintendents have completed OSHA 30 HourTraining course to supplement their CPR and <br />First Aid Training, <br />d, Critical Coordination Items <br />During our review of the logistics of this project, our team identifl@d four (4) of the 14 davit <br />system installations that will require significant coordination from the City and may Impact <br />the City & water operations, The four (4) include. <br />1) Davit i = W@§t Pump Station (Steel Tank Roof Conn@ctlon) <br />2) Davit 3 = East Pump Station (St@@I T@nk Roof Conn@ction) <br />3) Davit 3 = South Pump Station (Con€Fete Pr@€a§t P@n@I Tank Roof Conn@€tion) <br />4) Davit 13 = C@mbridg@ Pump Station (Con€r@t@ PF@€a§t Pan@I T@nk Roof Conn@€tion) <br />R@§@d on th@ detailing §hown in th@ pr@liminafy f@a§ihility §tudy, €h@§@ four (4) F@§@Fvoif§ will <br />n@@d to b@ dr@in@d and tak@n out of §@Fvi€@ for th@ in§t@il@ti@n of th@ davit §y§t@m to th@ <br />r@of, Th@ §t@@I tank roof§ r@goif@ w@Iding to t@k@ pla€@ on th@ and@F§id@ of th@ roof which <br />must be p@fform@d in§id@ th@ tank, Additionally, w@iding of th@ §t@@I tank r@@f will f@guir@ <br />touching up th@ €gating on th@ and@r§id@ of th@ roof for €off®§ion pf@t@€ti@n. Th@ pr@€@§t <br />€on€f@t@ F@@f§ ar@ §h@wn with thf@ugh h@It§ and flat§ Wrig in§t@ll@d on th@ and@r§id@ of th@ <br />fo@f which al§@ must h@ in§tall@d in§id@ th@ tank: <br />ON flank§ ha§ d@§ign €@n€@pt§ a§ w@II a§ alt@fnat@ m@an§ and m@th@d§ that may allow th@ <br />€@n€r@t@ tank§ with pr@@@§t f@@f§ to §tay in §@fvi€@ during th@ in§tallati@n, but @§i§ting <br />€@nditi@n§ and m@an§ and m@th@d§ would n@@d to h@ F@vi@w@d and v@rifi@d W €@nfifm <br />f@a§ihility: ®uFing th@ §it@ inv@§tigati@n§ and d@§ign analy§i§, ®N T@nk§ would inv@§tigat@ <br />Pag@ ? of I <br />I <br />