My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DN TANKS INC.
Clerk
>
Contracts / Agreements
>
D
>
DN TANKS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 2:23:40 PM
Creation date
3/4/2020 3:04:44 PM
Metadata
Fields
Template:
Contracts
Company Name
DN TANKS INC.
Contract #
A-2020-021
Agency
PUBLIC WORKS
Council Approval Date
2/18/2020
Expiration Date
2/17/2023
Insurance Exp Date
5/1/2023
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />INTRODUCTION AND BACKGROUND <br />The City of Santa Ana is located in the County of Orange in Southern California. The City <br />encompasses 27.2 square miles and a population over 343,000 people. <br />The City of Santa Ana Public Works Agency— Water Resources Division oversees and maintains <br />the daily operations of the Water System and Sanitary Sewer System. The City of Santa Ana's <br />water system has an average day demand of about 43 MG with 45,000 services. It is comprised <br />of approximately 478 miles of water main, 45 MG of storage at 5 sites, 7 MWD connections, 21 <br />groundwater wells, 7 pump stations, 4 pressure regulating stations and utilizes 2 pressure zones <br />The City desires to Implement Davit Fall Arrest Systems at various water and sewer facilities. <br />The City is soliciting proposals from qualified firms to provide professional engineering services <br />to provide final design and Installation services. The City shall select one firm to provide these <br />services. <br />DESCRIPTION OF PROJECT <br />The Contractor's scope of services shall Include the following tasks; <br />Task 1 - Proiect Management: <br />The Contractor shall conduct a kickoff meeting with the City to discuss the goals and objectives <br />for the project, At this kickoff meeting, project reporting/communication protocols will be <br />established, a project schedule will be provided and key issues will be discussed to establish the <br />project guidelines, The Contractor will prepare and lead all meetings and provide meetings <br />minutes, <br />The Contractor shell conduct at least one project team meetings throughout the project duration <br />and include key City staff as well as key sub=Contractors/consultants, <br />The Contractor shall submit an Initial schedule with pertinent milestones for the major tasks <br />Involved In the Pfoj@ot, The schedule shall be updated monthly, or more often, as required, <br />flask 2 = Desian Servigesr <br />The Contractor's Fngin@@r shell us@ the Davit Fail Arr@st System Feasibility Study (Exhibit t) @s <br />the bosis of final design for @ooh Davit Fell Arrest Syst@m in@toliation, Final plans shell modify <br />andlof verify the pr@po@@d design, prop®@@ any @hang@@ and Install the @yst@m, @ubj@ot to the <br />f@vi@w and approval of the City, The C@ntrootof @ Engin@@r shall perform final @tfu@tur@I <br />oaloulations to @onflfm the @d@qu@oy@f the @ 0fig stfu@tur@@ to support the prupo@@d fall @rr@st <br />@y@t@m@ @@ w@II @@ modifying the @n@h@f@ @ d@@ign@ provided in Exhibit t a@ n@@@@safy: A <br />waterproofing d@@ign and final OWN @h@ll b@ pr@vid@d for any w@II/roof p@n@tr@tion@ where <br />waterproofing i@ r@q@if@d, Th@ C@ntr@otof'@ Ingin@@r i@ @xp@ot@d to r@@pond to @il R@qu@@ts for <br />Information @@ n@@d@d, @ubj@tat to th@ mvi@w and th@ approval of the W@t@f Divi@ion, <br />Pily of @SAts AAS = @FP t 9=091 <br />pi <br />
The URL can be used to link to this page
Your browser does not support the video tag.