Laserfiche WebLink
Contractor attempts to contact Customer to confirm that the Container is accessible, but <br />Customer is non -responsive, Contractor need not return that day and, therefore, may <br />not charge the return trip fee. <br />4.3.14 On -Call Bulky Item Pickup - Multi -Family Premises with Refuse Bin Service <br />and Commercial Premises Customers <br />[TO BE UPDATED BASED ON COMPANY'S PROPOSAL.] <br />4.3.15 Holiday Tree Collection - Multi -Family Bin Customers <br />Contractor shall collect all holiday trees discarded by Multi -Family Premises during the <br />three weeks following Christmas Day, at no additional charge. After this period, trees <br />will be Collected as Bulky Items under Section 4.3.14. Trees under six (6) feet in length <br />will be Collected and diverted without Customers needing to cut them. Contractor may <br />require that Customers with larger trees cut the trees to pieces no longer than six (6) <br />feet, and that tinsel, ornaments and stands be removed prior to placement at Collection <br />point (curb or as otherwise determined by Customer and Contractor). Contractor will <br />Divert all holiday trees from landfilling. Contractor shall have no obligation to Collect <br />larger trees if they have not been cut into pieces no longer than six (6) feet. Holiday <br />trees with tinsel, ornaments or stands attached may be landfilled. <br />4.4 City Services (City Government Operations) <br />4.4.1 City Government Operations <br />Contractor shall collect all Solid Waste, Electronic Waste, and Construction and <br />Demolition Solid Waste which is generated by City government operations at no <br />additional cost to the City. The City shall provide Contractor with a list of locations of <br />bins and/or Roll -off containers from which such Solid Waste shall be collected. Said list <br />may be modified by time to time by the Executive Director. Solid Waste generated by <br />such City operations shall be collected by Contractor per a schedule provided to <br />Contractor by the Executive Director. Schedule shall be approved between the <br />Contractor and the Executive Director. <br />4.4.2 Construction and Demolition from City Government Operations <br />The City will implement procedures to separate wood, Organics, metals, and inert <br />materials from mixed waste generated through City construction projects, from City <br />March 9, 2020 50 City of Santa Ana - DRAFT <br />60A-139 <br />