Laserfiche WebLink
Step Two - The first rate adjustment cost components as a percentage of total costs are <br />provided in Section 6.4.2 above, with subsequent components calculated in Step Four of <br />the rate adjustment. For Step Two of each subsequent rate adjustment, use the cost <br />components recalculated in Step Four during the previous rate adjustment. <br />Multiply the percentage changes for each rate adjustment component by that <br />component's weighting and add these resulting percentages together to get the total <br />weighted change to the rates. <br />Step Three - Multiply the total weighted percent change from Step Two by the existing <br />Pull Per Load - All Types and Sizes rate to calculate the increase or decrease to the <br />maximum rate. Then add (subtract) the change in rates to (from) the existing maximum <br />rates to determine the new maximum rates. <br />Step Four - Recalculate weightings for the following year based on these changes. <br />Roll -Off Tonnage Charge <br />Step One - Calculate the percentage increase or decrease in the tonnage component for <br />"Roll -Off Tonnage Charge" listed in Section 6.4.2. The increase or decrease in the rate <br />adjustment indices for the tonnage component will be for the change in the average <br />annual published indices for the twelve (12) month period ending December prior to <br />the July 1 when the rate change will take effect. <br />Step Two - Multiply the percent change from Step One by the existing tonnage rate to <br />calculate the increase or decrease to the maximum rate. Then add (subtract) the change <br />in rates to (from) the existing maximum rates to determine the new maximum rates. <br />Note: Under the Waste Disposal Agreements (WDA) with Orange County Waste and <br />Recycling, the per ton gate rate, which is a portion of the "Roll -Off Tonnage Charge, is <br />adjusted annually based on the increase or decrease in the Consumer Price Index for All <br />Urban Consumers (CUUROOOOSAO), all items, U.S. city average, not seasonally adjusted, <br />until the WDAs expire in 2025. In the event that there is an extraordinary adjustment to <br />the Orange County Landfill per ton gate rates during or after the term of the WDAs, <br />Contractor may request an extraordinary rate adjustment to the Roll Off Tonnage <br />Charge as provided in this Agreement in Section 6.5. <br />March 9, 2020 94 City of Santa Ana - DRAFT <br />60A-183 <br />