My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60A - ISSUANCE OF DRAFT SOLID WASTE SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/17/2020_Regular and Special
>
60A - ISSUANCE OF DRAFT SOLID WASTE SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:23:25 PM
Creation date
3/12/2020 5:34:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60A
Date
3/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Adjustment for Contractor's Monthly Compensation for Other Services <br />StMOne - Calculate the percentage increase or decrease in the CPI. The increase or <br />decrease in the will be for the change in the average annual published indices for the <br />twelve (12) month period ending December prior to the July 1 when the rate change <br />will take effect. <br />St�Two - Multiply the percent change from Step One by the existing compensation to <br />calculate the increase or decrease to the maximum rate. Then add (subtract) the change <br />in compensation to (from) the existing maximum compensation to determine the new <br />compensation. <br />6.4.6 Rate Adjustment for Optional Construction and Demolition Roll -Off Box and <br />Bin Services <br />[Upon determination by City Council to include the optional construction and <br />demolition services in this Agreement, the rate increase methodology for this program <br />shall be included in this section] <br />6.5 Extraordinary Adjustments <br />Contractor or City may request an adjustment to maximum rates at reasonable times <br />other than that allowed under Section 6.3 in the event of extraordinary changes in the <br />cost of providing service under this Agreement. Such changes shall not include <br />changes in the market value of Recyclables from the values assumed in Contractor's <br />Proposal, inaccurate estimates by the Contractor of its proposed cost of operations, <br />unionization of Contractor's work force, or change in wage rates or employee benefits. <br />Contractor may request an extraordinary adjustment based on changes in a direct per <br />ton fee assessed at the Disposal Site by federal, state or local regulatory agencies after <br />the effective date. Extraordinary rate adjustments shall only be effective after approval <br />by City Council in compliance with California Constitution Article XIIID (Proposition <br />218) and the Proposition 218 Omnibus Implementation Act (Govt. Code Sections 53750 <br />et. seq.) and may not be applied retroactively. <br />For each request for an adjustment to the maximum rates that Contractor may charge <br />Customers brought pursuant to this section, Contractor shall prepare a schedule <br />documenting the extraordinary costs. Such request shall be prepared in a form <br />acceptable to City with support for assumptions made by Contractor in preparing the <br />March 9, 2020 95 City of Santa Ana - DRAFT <br />60A-184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.