My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60A - ISSUANCE OF DRAFT SOLID WASTE SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/17/2020_Regular and Special
>
60A - ISSUANCE OF DRAFT SOLID WASTE SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:23:25 PM
Creation date
3/12/2020 5:34:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60A
Date
3/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
services as described in Section 5.1 with the exception of Residential Curbside Service <br />Units which are billed by the City. Contractor further agrees that, in such event, it shall <br />reimburse City for any and all costs and expenses incurred by City beyond that billed <br />and received by City in taking over possession of the above -mentioned equipment and <br />property for Solid Waste service in such manner and to an extent as would otherwise be <br />required of Contractor under the Terms of this Agreement. Such reimbursement shall <br />be made from time to time after submission by City to Contractor of each statement <br />listing such costs and expenses, but in no event later than five (5) working days from <br />and after each such submission. <br />10.4 City's Right to Relinquish Possession <br />It is further mutually agreed that City may at any time at its discretion relinquish <br />possession of any or all of the above -mentioned property to Contractor and thereupon <br />demand that Contractor resume the Solid Waste services as provided in this <br />Agreement, whereupon Contractor shall be bound to resume the same. <br />10.5 City's Possession Not A Taking <br />Except as otherwise expressly provided in the previous paragraph, City's exercise of its <br />rights under this Article (1) does not constitute a taking of private property for which <br />compensation must be paid, (2) will not create any liability on the part of City to <br />Contractor, and (3) does not exempt Contractor from any of the indemnity and <br />insurance provisions of this Agreement, which are meant to extend to circumstances <br />arising under this Section provided that the Contractor is not required to indemnify the <br />City against claims and damages arising from the active negligence of the City, its <br />elected and appointed boards, commissions, officers, employees and agents in the <br />operation of Collection vehicles during the time the City has taken possession of such <br />vehicles. <br />10.6 Duration of City's Possession <br />City's right pursuant to this Article to retain temporary possession of Contractor's <br />facilities and equipment, and to render Collection services, shall terminate when City <br />determines that such services can be resumed by Contractor, or when City no longer <br />reasonably requires such property or equipment. In any case, City has no obligation to <br />maintain possession of Contractor's property or equipment and/or continue its use for <br />March 9, 2020 118 City of Santa Ana - DRAFT <br />60A-207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.