My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT FOR SANTA AN WATERSHED PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/17/2020_Regular and Special
>
25C - AGMT FOR SANTA AN WATERSHED PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:18:59 PM
Creation date
3/12/2020 5:34:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
3/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
standards, and to require that such contractors and subcontractors retain such books, records, and <br />other material for a minimum of ten (10) years after completion of the Work. The Sub -Grantee <br />shall require that such books, records, and other material shall be subject, at all reasonable times, <br />to inspection, copying, and audit by SAWPA, DWR or its authorized representatives. <br />(C) All documents required or requested to be provided to SAWPA shall be submitted electronically in <br />both the native format (e.g. Microsoft Word, Microsoft Excel, etc) and PDF. All documents shall be <br />public domain or the property of SAWPA once submitted. <br />(D) The Sub -Grantee agrees to expeditiously provide, during the Work and for three years after <br />completion, such reports, data, information and certifications as may be reasonably required by <br />SAWPA or DWR. Such documents and information shall be provided in electronic format. <br />SECTION 17. REVIEW AND EVALUATION; FINAL REPORTS AND AUDIT <br />(A) SAWPA may perform a review or otherwise evaluate the Work to determine compliance with the <br />Contract at any time or if questions about the proper use or management of the funds arise. SAWPA <br />may review or evaluate Sub -Grantee's contractor or vendor for compliance with the terms and <br />conditions of the Contract. The review and evaluation may be performed by SAWPA or may be <br />contracted to a responsible third party. Any findings and recommendations of the review and <br />evaluation shall be addressed by the Sub -Grantee within sixty (60) calendar days of the date such <br />findings and recommendations are provided to the Sub -Grantee and before the next invoice is paid <br />by SAWPA. <br />(B) At least fifteen (15) calendar days prior to submission of the final invoice for the World Sub - <br />Grantee shall provide SAWPA the Disposition of Equipment per Exhibit D of the Grant <br />Agreement. <br />(C) In addition to the documents and deliverables required to be provided by the Grant Agreement, <br />with the final quarterly progress report Sub -Grantee will provide a Work Completion Report <br />containing at minimum, the applicable information listed in the Grant Agreement Section 15(b), <br />page 6. <br />The final Work Completion Report shall be accompanied by such other financial information as <br />may be required by SAWPA or DWR to verify Sub -Grantee entitlement to grant funds, to assure <br />program integrity, and to comply with any federal or state requirements. A duly authorized <br />representative of the Sub -Grantee shall certify the Work Completion Report as correct. <br />(D) SAWPA may call for an audit of financial information relative to the Work, where SAWPA <br />determines that an audit is desirable to assure program integrity or where such an audit becomes <br />necessary because of federal or state requirements. Where such an audit is called for, the audit <br />shall be performed by a Certified Public Accountant independent of the Sub -Grantee and at the <br />cost of the Sub -Grantee. The audit shall be in the form required by SAWPA. <br />SECTION 18. CLOSEOUT DOCUMENTATION <br />To ensure that that the Work is closed out in a manner that provides an auditable file for SAWPA, Sub - <br />Grantee shall follow a closeout procedure that includes payment of all contracts, subcontracts, or obligations, <br />and any other requirements for the completion of the scope of work Such close-out procedures shall include <br />those procedures contained in the Grant Agreement or otherwise required by SAWPA and DWR <br />Santa Ana Watershed Project Authority 25C _8 Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.