My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA FOR GRANT FUNDED GROSSWALK UPGRADE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
03/17/2020_Regular and Special
>
20A - AA FOR GRANT FUNDED GROSSWALK UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 12:39:32 PM
Creation date
3/12/2020 5:34:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
3/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract to Elecnor Belco Electric, Inc. for Crosswalk Upgrades Phase II <br />March 17, 2020 <br />Page 2 <br />Engineering and has been used for project design. However, spending authorization for the <br />remaining $460,400 in Construction funding was not received until September 2019. Staff is <br />requesting City Council approval to recognize and re -appropriate the construction grant funding for <br />expenditure in Fiscal Year 2019-20. Upon approval of the requested appropriation adjustment, the <br />total funds available for construction will be $460,400. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in <br />the Orange County Register newspaper on January 22 and January 29, 2020. Bids were received <br />electronically via the City's web -based electronic bidding system, PlanetBids, on February 12, <br />2020. <br />A total of 203 vendors, including vendors in the City of Santa Ana, were notified of the project via <br />PlanetBids. Project advertisement was open in PlanetBids starting January 22, 2020 through 2:00 <br />p.m. on February 12, 2020, for a total of 21 calendar days. Thirty-three vendors requested bidding <br />documents and six bids were received. No bids were received from Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Elecnor Belco Electric, Inc. <br />Chino <br />$285,295 <br />2 <br />California Professional Engineering, Inc. <br />La Puente <br />$312,395 <br />3 <br />International Line Builders, Inc. <br />Corona <br />$316,072 <br />4 <br />Crosstown Electrical and Data, Inc. <br />Irwindale <br />$332,659 <br />5 <br />Select Electric, Inc. <br />Vista <br />$334,659 <br />6 <br />PUB Construction, Inc. <br />Diamond Bar <br />$685,000 <br />All six bids were responsive and Elecnor Belco Electric, Inc. submitted the lowest responsive bid, <br />in the amount of $285,295 (Exhibit 2). Based on the bid analysis and a contractor's reference <br />check, staff recommends awarding the construction contract to Elecnor Belco Electric, Inc. in the <br />amount bid (Exhibit 3). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract awarded to the lowest <br />responsible bidder, the estimated total construction delivery cost of the project includes <br />construction administration, inspection, and testing, along with an allowance for contingencies to <br />account for unexpected or unforeseen conditions. Construction administration and inspection <br />includes construction management, implementation of the City's Community Workforce Agreement <br />requirements, inspection of the Contractor's work to ensure contract compliance, workmanship, <br />and quality, and material testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized <br />in the table below, the estimated total construction delivery cost of the project is $460,400. <br />20A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.