Laserfiche WebLink
5®q iomene ConwllaMb <br />Hashmi Quazi, PhD, PE, GE - Principal-in-Charge/QA/QC <br />Dr. Quazi has over 31 years of experience providing <br />geotechnical engineering services and has earned a EDUCATION <br />reputation for providing quality work in an honest and ethical • PhD, Civil Engineering, University <br />manner, on time and within budget. Dr. Quazi provides quality of Arizona, 1987 <br />control, budget oversight, and technical assistance on various ' MS, Civil Engineering, Arizona <br />State University, 1982 <br />types of projects, including pipelines, water treatment plants, BS, Bangladesh Engineering <br />wells, pump stations, water basins and other related projects. University, 1978 <br />Relevant Experience REGISTRATIONSICERTIFICATIONS <br />6651 <br />Orange Count Water District North Basin Groundwater California, Civil Engineer, Engineer, <br />g y E <br />California, Geotechnical Engineer, <br />Protection Pipeline, Fullerton and Anaheim, CA. Principal in #2517 <br />Charge. Provided resource and budget oversight, technical <br />review and contract management for the geotechnical observation, materials testing and <br />inspection. The project consisted of the construction of 27,713 linear feet of PVC pipeline, jack <br />and bore operations for steel casing of varying sizes at three separate locations and installation <br />of fiber optic well communications for two 4-inch PVC fiber optic conduits within pipeline trench <br />and pull boxes. <br />Orange County Water District Groundwater Replenishment System, Fountain Valley, CA. <br />Principal in Charge. Provided resource and budget oversight, technical review and contract <br />management for the geotechnical observation, materials testing and inspection. The project <br />consisted of modifying the OCWD Groundwater Replenishment System from 70 MGD to 100 <br />MGD. The project involved the Advanced Water Treatment Facility (AWPF) expansion, and the <br />Secondary Effluent Flow Equalization project. The expansion required the construction of <br />several new structures, including two 7.5 MG above -ground steel storage tanks, 1,000 linear <br />feet of 54-inch diameter pipeline, 200 linear feet of 54-inch diameter pipeline, a UV facility for <br />installation of two new UV trains, a decarbonation tower, a lime saturator, and other <br />modifications and upgrades. <br />Orange County Sanitation District P1-37 Primary Clarifiers 16-31 & Related Facilities, <br />Fountain Valley, CA. Principal in Charge. Provided resource and budget oversight, technical <br />review and contract management for the geotechnical observation, materials testing and <br />inspection. The project included the construction of 16 new primary clarifiers with support <br />equipment, improvements to existing primary clarifier 6-15 and improvements to primary <br />clarifiers 1-5. <br />Orange County Sanitation District P1-100 Sludge Digester Rehabilitation, Fountain Valley, <br />CA. Principal in Charge. Provided resource and budget oversight, technical review and contract <br />management for the geotechnical observation, materials testing and inspection. The project <br />involved the rehabilitation of 12 digesters at the OCSD Plant 1. The project was intended to <br />repair and replace aging equipment, such as pumps, sludge grinders, heat exchangers, and <br />piping, thus making the facilities more efficient for increased solid waste handling. It also <br />includes 1,500 s.f. expansion of the Power Building No. 5. <br />25B-52 <br />