Laserfiche WebLink
V C.m Mc nwltaM <br />Siva Sivathasan, PhD, PE, GE, DGE, QSD, F.ASCE - <br />Principal Engineer <br />Dr. Sivathasan is a registered civil and geotechnical engineer EDUCATION <br />in California, with 25 years of geotechnical and construction ' PhD, Civil Engineering, University of <br />experience. He is skilled at analyzing complex geotechnical California, Davis, 2002 <br />• MS, Civil Engineering, University of <br />problems and has prepared comprehensive reports with California, Davis, 1997 <br />detailed recommendations. He also has extensive knowledge • BS, Civil Engineering, University of <br />of construction projects from managing geotechnical Peradeniya, Sri Lanka, 1994 <br />observation and testing, special inspection and material <br />testing, and Caltrans source inspection services. He has been REGISTRATIONS/CERTIFICATIONS <br />providing these services on pipeline, water treatment plants, <br />pump stations, wells, reservoirs and other related project ' California, Civil Engineer <br />types. No. 63185 <br />• California, Geotechnical Engineer <br />No. 2708 <br />Relevant Experience • Diplomate in Geotechnical <br />Engineering No. 1169 <br />Orange County Water District Groundwater ' CFR 1910.120 OSHA 8-Hour <br />Replenishment System, Fountain Valley, CA. Project Refresher Training <br />• CFR 1910.120 OSHA 40-Hour <br />Manager. Responsible for geotechnical investigation and Training <br />geotechnical observation and testing during construction. The • Nuclear Soil Density Gauge <br />project consisted of modifying the OCWD Groundwater Certification <br />Replenishment System from 70 MGD to 100 MGD. The <br />project involved the Advanced Water Treatment Facility (AWPF) expansion, and the Secondary <br />Effluent Flow Equalization project. The expansion required the construction of several new <br />structures, including two 7.5 MG above -ground steel storage tanks, 1,000 linear feet of 54-inch <br />diameter pipeline, 200 linear feet of 54-inch diameter pipeline, a LIV facility for installation of <br />two new LIV trains, a decarbonation tower, a lime saturator, and other modifications and <br />upgrades. <br />California Water Service Pump Station 42, Los Angeles, CA. Project Manager. Responsible <br />for geotechnical investigation and geotechnical observation and testing during construction. <br />The project consisted of booster station upgrades at Pump Station 42 adjacent to property at <br />1037 North Eastern Avenue, Los Angeles, California. The concrete masonry pump building, a <br />4,000-gallon surge tank concrete pad, and one diesel generator pad were constructed at the <br />site. The project included a seismic hazard evaluation to meet current applicable seismic codes. <br />The structure loads for the proposed construction are not known at this time and are anticipated <br />to be low. <br />East 27t' Street Water Main Replacement, Long Beach, CA. Project Manager/Project <br />Engineer. Provided oversight of the geotechnical observation and testing, special inspection <br />and material testing during construction. The project consisted of replacing existing water line <br />with 4,100 linear feet of cast iron pipe on East 27th Street, Elm Avenue, Pasadena Avenue, <br />Linden Avenue and Via Passilo in the City of Long Beach, California. The project included the <br />installation of various valves, service laterals and fire hydrants; reconnecting existing service <br />lines and fire hydrant lines to the new water line; replacing existing water meters; abandoning <br />existing water mains and service laterals. <br />25B-53 <br />